My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/27/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/27/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:23:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
02/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTORNEY COLLINS ASKED IF IT WOULD FIT WELL INTO THE <br />SCHEME OF THINGS IF THE COUNTY WERE TO SIGN THE CONTRACTS ON <br />MARCH 21ST. <br />MR. SCHNEIDER FELT THEY COULD LOOK FORWARD TO A PURCHASE <br />OF THE NOTES BY MARCH THE 12TH, AND COORDINATOR THOMAS NOTED THAT IF <br />THE BOARD AWARDED THE CONTRACT TODAY, THEY THEN COULD PROCEED IMMEDI- <br />ATELY TO GET OUR RATING, AND EVERY DAY ISA DAY SAVED FOR THE ACTUAL <br />ISSUANCE OF THE BONDS THEMSELVES. <br />COMMISSIONER LOY ASKED ARNOLD SCHNEIDER OF WILLIAM HOUGH <br />& CO, IF THEY HAVE EVERYTHING THEY NEED. <br />MR. SCHNEIDER STATED THAT THEY ARE STILL WAITING FOR SOME <br />INFORMATION, WHICH HE BELIEVED IS NOW READY. HE EXPLAINED THAT FROM <br />A DISCLOSURE STANDPOINT, THEY NEED A SUMMARY DESCRIPTION OF THE <br />PROJECT AND AN IDENTIFICATION OF THE VARIOUS COMPONENTS AND COSTS <br />TO BE PREPARED BY CONNELL, METCALF & EDDY. <br />RAN SINGH INFORMED THE BOARD THAT THE SUMMARY DESCRIPTION <br />IS READY; IT HAS BEEN PREPARED, AND HE HAS IT WITH HIM. <br />ATTORNEY COLLINS FELT WHAT THE BOARD IS REALLY CONSIDERING <br />IS A SCHEDULING PROBLEM. HE NOTED THAT WE HAVE 60 DAYS FROM THE <br />OPENING OF BIDS TO AWARD THE CONTRACT, AND IT SEEMS THERE NEEDS TO <br />BE SOME CONVERSATION BETWEEN THE CONTRACTOR AND THE ARCHITECT ABOUT <br />SCHEDULING. HE FELT WE CAN SHOW OUR INTENT BUT STATED THAT HE <br />WOULD LIKE TO SEE THE CONTRACTS AWARDED AFTER SITE PLAN APPROVAL, <br />WHICH HE FELT CAN BE ACCOMPLISHED BY MARCH 20TH. <br />MR. REINHOLD POINTED OUT THAT IF IT IS RUNNING $1,500 A <br />DAY JUST FOR THE COST OF THE MONEY, AS STATED BY THE COORDINATOR, HE <br />FELT THE BOARD COULD APPRECIATE HIS PROBLEM WITH ALL THE FIXED PRICE <br />CONTRACTS WITH WHICH HE HAS TO DEAL. HE THEN WENT ON TO EXPRESS <br />MORE OF HIS THOUGHTS ABOUT A RENOVATION PROJECT, NOTING THAT THEY <br />ARE NOT.GOING TO FIGURATIVELY TEAR THE ROOF OFF THE BUILDING; THEY <br />ARE GOING TO BE MOVING WALLS AND PARTITIONS AND. THE BUILDING WOULD BE <br />ACCESSIBLE TO ALL EMPLOYEES. THEY MIGHT HAVE TO HAVE SOME POWER OUT <br />AND THERE WOULD BE A TIME WHEN YOU WOULDNIT HAVE AIR CONDITIONING, <br />FEB 2 7 19 90 9 em. . , 42 pAcE 800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.