Laserfiche WebLink
Under discussion, Vice Chairman Neuberger asked how we would know that the <br />construction is equal to what the County would normally do on such a project. <br />Public Works Director James Davis noted that even though Water’s Edge is a fairly <br />new subdivision and the roads were platted privately, the roads were scrutinized by Public Works <br />staff. The design engineer also had to certify that the roads and all infrastructure were built in <br />accordance with County standards. We received density reports, the certification from the PE who <br />designed it, and staff was watching the construction. We require them to call us prior to the base <br />going in and the asphalt going on and inspections are scheduled. He was confident that the roads <br />were put in according to County standards. There are a couple of very minor defects that the <br />property owners have agreed to correct. <br /> <br />The Chairman CALLED THE QUESTION and the Board <br />unanimously approved the motion. \[The County <br />Attorney’s office was authorized to prepare the appropriate <br />th <br />documents to assume ownership of 35 Square SW, as <br />recommended in the memorandum of June 1, 2004. <br />(Alternative #1) (When all documents are properly <br />executed and the funds for repair are submitted, the County <br />shall accept ownership and maintenance.)\] <br /> <br />11.I.9. PELICAN ISLAND NATIONAL WILDLIFE REFUGE UPLAND <br />RESTORATION PROJECT – PROJECT 0386 – SITEWERKS, <br />INC. – CHANGE ORDER NO. 1 <br /> <br />ON MOTION by Commissioner Adams, SECONDED by <br />Vice Chairman Neuberger, the Board unanimously <br />approved Change Order No. 1 to the contract with <br />June 8, 2004 <br />23 <br /> <br />