Laserfiche WebLink
5. Phase I cost shall not exceed $55,000, the <br />aerial photography $115,000 and the final report <br />will be $95,000 for a total cost of $265,000. <br />The 70/30 split would mean the County's cost <br />would be $185,000. <br />Pad Vywon'sNAN 1 <br />e ! <br />/ P <br />Enclosures <br />Dave Rever Neil Nelson <br />MR. NELSON THEN POINTED OUT THERE WAS_A REVISED SUPPLEMENTAL <br />AGREEMENT #Z, WHICH IS ENCLOSURE 3, AND_THIS_WAS DISTRIBUTED TO THE <br />COMMISSIONERS. HE STATED THAT THE DRAINAGE TECHN+CAL ADVISORY <br />COMMITTEE, COMPRISED OF COMMISSIONER LYONS, DAVID REVrR AND HIMSELF, <br />VERY ENTHUSIASTICALLY RECOMMEND THAT THE AGREEMENTS COVERED IN THEIR <br />MEMO BE SIGNED. HE COMMENTED THAT THE CITY OF VERO BEACH DID ADOPT <br />THE JOINT MASTER CONSULTING AGREEMENT AND THE TWO SUPPLEMENTS,PLUS <br />ADOPTED AN AGREEMENT OF THEIR OWN, BUT LEFT OUT THE ROYAL PARK AREA <br />FOR RENEGOTIATIONS. <br />COMMISSIONER LYONS COMMENTED THAT HE REALIZED THAT THIS IS <br />AN EXPENSIVE UNDERTAKING BUT WE DO HAVE A PROBLEM THAT IS GETTING WORSE, <br />AND NOW IS THE TIME TO FACE UP TO IT AND DO IT. HE CONTINUED THAT ONE <br />THING WE WILL GET OUT OF THIS IS A SET OF MAPS WHICH WILL BE INVALUABLE <br />AS FAR AS THE PLANNING DEPARTMENT AND DEVELOPERS ARE CONCERNED, AND <br />WE SHOULD BE ABLE TO RECOVER PART OF THIS COST ON THE SALE OF THESE <br />MAPS. COMMISSIONER LYONS NOTED THAT IT IS A LOT CHEAPER FOR THE <br />DEVELOPER TO BUY THE MAPS FROM US INSTEAD OF GOING TO A SURVEYOR. HE <br />ADDED THAT THE GROUND IS STILL VISIBLE, PARTICULARLY AFTER OUR FROST, <br />BUT IF WE ARE GOING TO DO THE SURVEY THIS YEAR, WE MUST MOVE ON IT <br />RIGHT NOW. <br />HOWARD B. BOCHIARDY AND ROD GHITO, OF REYNOLDS, SMITH AND <br />HILLS, INTRODUCED THEMSELVES TO THE BOARD. <br />C <br />wi <br />MAR 191980 - mac 43 vacs 15 <br />