Laserfiche WebLink
APR 9.19x0_.- 0& <br />r� <br />- BdOXJ PAGE <br />WABASSO BEACH PARK PROJECT <br />MATERIALS LIST - PRELIMINARY <br />Paving materials (110' of 12 - 14' roadway) type #2 asphalt - soil cement <br />Landscaping (materials list is being prepared) <br />Treated poles and cables - approx. 50 poles (6"-8" x 8') <br />approx. 750' of heavy gauge strand cable <br />8000 sq. ft. of jute matting and sun screen <br />Approx. 500 lbs. commercial 16-8-8 or 8-8-8 fertilizer <br />Railroad ties (75 - 8' sections) palm tree trunks could be substituted <br />Renovation materials for 4 picnic shelters - paint, replacement wood <br />(roof sheathing and facia) - hurricane clips, nails, felt paper and <br />shingles (approx. 1500 sq. ft.) <br />North picnic area equipment - 4 concrete picnic tables, 3 steel grills, <br />8 garbage cans with locks and chains to secure <br />6 rack bike stand <br />Wood chips <br />M <br />M <br />61 <br />