My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/21/1980
CBCC
>
Meetings
>
1980's
>
1980
>
5/21/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 11:27:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/21/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AVAILABILITY BEING QUESTIONED AND THE VARIOUS INTERLOCAL AGREEMENTS <br />THAT MUST BE RESOLVED IN THE MEANTIME, THEY FEEL A MORE REALISTIC <br />IMPLEMENTATION DATE FOR SEWER SERVICE UNDER PHASE 1 OF THE 201 PLAN <br />WOULD BE 1986. THE OTHER CRITERIA WOULD BE WATER SERVICE TO THIS <br />PARTICULAR AREA: THEY ARE LOOKING AT PHASE 1 OF THE SOUTH WATER <br />DISTRICT TAXING UNIT, WHICH THEY BELIEVED COULD BE IMPLEMENTED IN <br />19821 AND ALTHOUGH THERE ARE RESERVE CONNECTIONS AVAILABLE IN THE <br />TREATMENT PLANT, THEY BELIEVE IT WOULD BE 1990_ BEFORE YOU COULD EXTEND <br />TO THIS AREA. <br />SQUARED OFF AREA N0. 3 IS TO THE SOUTH SIDE OF 17TH STREET <br />AND WILL REMAIN PERMANENTLY ON CITY WATER AND SEWER AND IS NOT <br />REFERRED TO IN THE CONSTRUCTION SCHEDULE. SQUARED OFF AREA N0. 2 <br />IS THE AREA AROUND THE NORTH OF THE CITY LIMITS AND SOUTH OF THE <br />HOSPITAL AREA. WATER AND SEWER MUST BOTH BE PROVIDED, AND IN ORDER <br />FOR THE COUNTY TO SERVE THIS AREA, IT APPEARS THE BEST THING WOULD <br />BE TO PROVIDE AN EXTENSION FROM THE GIFFORD SERVICE AREA, HERE AGAIN <br />THEY REFER TO A NORTH COUNTY WATER PLANT AND A TARGET DATE OF 19901 <br />AND SEWER SERVICE FROM PHASE 1 OF THE 201 PLAN, OR 1986. MR. ROBBINS <br />NEXT DISCUSSED SPECIFIED COMMERCIAL OR INSTITUTIONAL CUSTOMERS, I.E., <br />CUSTOMERS INTERSPERSED ALONG U.S. HIGHWAY 1 -.00EANSIDE MOTORS, WENDY'S, <br />AMERICAN OIL COMPANY, ETC. TO SERVICE THESE, -THERE ARE THREE CON- <br />TROLLING DATES RELATING TO THE NORTH COUNTY WATER PLANT, THE SOUTH. <br />COUNTY WATER PLANT, PHASE 1, AND PHASE 1 OF THE 201, WITH AN ULTIMATE <br />DATE OF 1990. MR. ROBBINS THEN REVIEWED THE ANTICIPATED CONSTRUCTION <br />DATES FOR SEWER SERVICE AS SET OUT IN THE SCHEDULE, NOTING THAT ON <br />THE U.S. 1 CORRIDOR, WATER SERVICE COULD BE PROVIDED IMMEDIATELY AND <br />TIED INTO THE 600,000 GALLON ALLOCATION WITH ULTIMATE REVERSION TO <br />THE BEACH AREA. <br />COMMISSIONER LYONS BELIEVED IT IS IMPORTANT TO COME TO <br />SOME AGREEMENT ON THIS SCHEDULE IN ORDER TO KEEP THE AGREEMENT NEGO- <br />TIATIONS MOVING, AND CHAIRMAN SIEBERT ASKED IF WE SHOULD OFFICIALLY <br />ADOPT THIS SCHEDULE. <br />ATTORNEY COLLINS DID NOT FEEL THAT HE AND MR. ROBBINS WERE <br />SPECIFICALLY ASKING, THAT THE BOARD DO THAT TODAY, BUT MAINLY WISHED <br />MAY 21.1980 -71- � 4 Pct <br />
The URL can be used to link to this page
Your browser does not support the video tag.