Laserfiche WebLink
ON MOTION BY COMMISSIONER DEESON, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY GRANTED FINAL APPROVAL TO FOREST PARK <br />SUBDIVISION, UNIT 2 (VISTA ROYALE). <br />SENIOR PLANNER DAVID MARSH GAVE A PROGRESS REPORT ON THE <br />DEVELOPMENT OF WABASSO BEACH PARK. HE STATED THAT HE DID TALK WITH <br />THE DEPARTMENT OF NATURAL RESOURCES, THE LEAD AGENCY ON THE GRANT <br />APPLICATION, AND WAS NOTIFIED THAT OFFICIAL APPROVAL HAS BEEN GRANTED. <br />MR. MARSH THEN WENT ON TO REVIEW THE PROGRAM SCHEDULE THAT HAS BEEN <br />WORKED UP WITH THE ADMINISTRATOR, THE ROAD & BRIDGE DEPARTMENT, AND <br />THE CONSULTING ENGINEERS. HE ANTICIPATED THAT IN .JUNE THEY WILL BE <br />DOING SOIL ANALYSIS, FILLING, DRESSING AND STABILIZING THE BLUFF LINE, <br />PLACING FENCING POLES, WHETHER PERMANENT OR TEMPORARY, SO TRAFFIC <br />DOES NOT GET ONTO THE BLUFF LINE AND ALSO ARE SCHEDULING DEMOLITION <br />OF THE EXISTING STRUCTURES WHICH CANNOT BE REHABILITATED AND RENOVATING <br />THOSE THAT CAN BE UTILIZED. MR. MARSH STATED THAT THE ROAD & BRIDGE <br />SUPERVISOR, GENE HAMILTON, FELT THIS WAS A REALISTIC SCHEDULE AND <br />COULD BE ACCOMPLISHED IN THE NEXT FOUR TO FIVE WEEKS, IF THE PROJECT <br />WERE GIVEN PRIORITY BY THE COUNTY COMMISSION. JUNE THROUGH JULY, <br />THEY WILL BE COMPLETING DETAILS ON THE VARIOUS SUBSTANTIAL STRUCTURES, <br />SUCH AS THE BOARDWALK AND RELIEF FACILITIES, MAKING THE NECESSARY <br />PERMIT APPLICATIONS, PREPARING SPECIFICATIONS, -AND BEGINNING THE <br />PROCESS FOR INITIATING BIDDING. .JULY THROUGH SEPTEMBER, THEY WOULD <br />ANTICIPATE LETTING CONTRACTS AND CONSTRUCTING THE BOARDWALK, GAZEBO, <br />RELIEF STATIONS AND PERHAPS TWO CROSSOVERS. SEPTEMBER THROUGH OCTOBER, <br />THEY WOULD BRING THE COUNTY CREWS BACK IN AND DO THE FINAL WORK ON <br />DRESSING OUT - LANDSCAPING, PAVING, ETC. THEY ARE HOPING FOR COMPLETION <br />BY NOVEMBER, IF GIVEN PRIORITY., MR. MARSH NOTED THAT HE NEEDED TO <br />DISCUSS FOUR THINGS IN DETAIL: <br />(1) CONCEPTUAL APPROVAL OF THE PROGRAM SCHEDULE; <br />(2) DIRECTION AS TO WHAT ASPECTS OF THE PROJECT THE BOARD WISHES TO <br />GO INTO THE BIDDING PROCESS; <br />(3) AUTHORIZATION FOR ROAD & BRIDGE TO PROCEED UNDER THIS SCHEDULE <br />ON A PRIORITY BASIS WITH PRIMARILY THE BLUFF LINE WORK; AND <br />MAY 211980 <br />