My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/4/1980
CBCC
>
Meetings
>
1980's
>
1980
>
6/4/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 11:29:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/04/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 419 O aooK 43 PAGE 7i0 <br />There are several alternatives open as to which way we <br />head: <br />1. Repair the Permutit units again. This was done about a <br />year ago at a cost of about $9,000.00. The result was <br />still poor water and complaints and the eventual failure <br />of the treatment units. At best, it is an antiquated <br />treatment method that is no longer allowed for public water. <br />I believe the cost of the lost media and refurbishment will <br />be much more than it cost before. <br />2. Continue as we are now, but officially appealing that bulk <br />rates averaging over double the North County bulk rates <br />are excessive and discriminatory. I presume that rates <br />on the order of 60 to 75 cents per thousand would probably <br />cover the pumping costs to South County and pay the city <br />for the added load on their treatment. This would have <br />to be determined by the utility rate audit yet in process <br />and have to be negotiated, retroactively. <br />3. We have the possibility of a Franchisee furnishing all the <br />water the County requires on an emergency basis. We envision <br />that this source would supply water that will reduce (or <br />possibly avoid.completely) the water to be purchased from <br />Vero Beach for South County. I cannot give all the details <br />at the present time but should have further information <br />as to how this can be accomplished in about a week. <br />4. Attempt to speed up the sequence for getting the new South <br />County Water Plant installed and on line. The present <br />failure problem emphasizes the need to get the system to <br />avoid dependence on Vero Beach with its severe penalty. <br />I recommend that we avoid repair of the Permutit units <br />on such a temporary basis. Proceeding with all other alternatives <br />together should not involve any large expense by the County but <br />will relieve the problem the fastest way. <br />GL/kh <br />cc: Joe Collins <br />John Robbins <br />file <br />Attachments: 1. <br />2. <br />3.' <br />Letter, Liner to Little, dated 5/19/80 <br />Letter, Liner to Little, dated 5/23/80 <br />South County Water pumped into system <br />before and after plant failure <br />108 <br />M <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.