My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/4/1980
CBCC
>
Meetings
>
1980's
>
1980
>
6/4/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 11:29:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/04/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER JOHN ROBBINS CAME BEFORE THE BOARD TO REVIEW THE <br />FOLLOWING INFORMATION WHICH SETS OUT THE ALTERNATIVE COST EVALUATIONS <br />FOR THE VERA CRUZ PUMPING STATION: <br />ALTERNATIVE COST EVALUATION FOR <br />THE VERA CRUZ PUMPING STATION <br />I SCOPE: The scope of this evaluation is to analyze the construction <br />costs associated with each of the six alternatives considered <br />for the Vera Cruz pump station. The six alternatives were <br />outlined in a memorandum from Mr. Lynn E. Mueller of the Joint <br />Venture to Mr. George Liner, County Utilities Director, dated <br />April 1, 1980, copy attached. <br />The costs presented in this evaluation are intended to provide <br />the County Commission with data necessary to determine the <br />appropriate fee(s) due the County by the Harbor Island <br />Developers for County sewer service within the Pebble Bay <br />sewerage area. <br />It should be noted, the cost shown in this evaluation are based <br />on engineering estimates which were determined by contacting <br />various contractors who have the required experience for this <br />type of work, evaluation of other project bids of similar scope <br />and engineering judgement. <br />II COST EVALUATION: Listed following in Table 1 are s -ix pump station -alterna- <br />tives with applicable descriptions.. Also listed are the es- - <br />timated construction costs associated with each alternative. <br />Alternative No. 6 was used as the basis for cost determinations <br />and the other alternative costs were adjusted up or down <br />accordingly. Also shown with each alternative is an estimate of <br />the pro rata share applicable to the Harbor Island Development. <br />The formula used for determination of the pro rata share is given <br />by: <br />JUN <br />Pro Rata Share = Number of Units in Harbor Island X Construction <br />Total Units Connected to Vera Cruz Cost for each <br />Pump Station for Each Alternative Alternative <br />e <br />79 _ .. <br />4 80 <br />BOOK 43?�°FAcE fib t <br />
The URL can be used to link to this page
Your browser does not support the video tag.