My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/4/1980
CBCC
>
Meetings
>
1980's
>
1980
>
6/4/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 11:29:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/04/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUK 41980 TABLE I - ALTERNATIVE COST SUMMARY <br />FOR VERA CRUZ PUMP STATION AND PRO RATA SHARE t 682 <br />DETERMINATION FOR HARBOR ISLAND CLUB <br />Estimated <br />Alternative Construction Harbor Island <br />No. Alternative Description Cost Pro Rata Share <br />1. Reworking existing Vera Cruz $ 3,000 Not applicable - does <br />pump station to provide added not consider Harbor <br />pump, motor, electrical panel Island flow. <br />and place in operation to <br />D.E.R. compliance. Station <br />to receive flow from Pebble <br />Bay North and South and Vera <br />Cruz Condominiums.- Pump to <br />existing S.T.P. <br />Same as Alternative No. 1 but <br />consider inclusion of flow <br />from Harbor Island <br />New Vera Cruz pump station <br />receiving flow from Pebble <br />By North and South and Vera <br />Cruz Condominiums. Pumping <br />to the existing S.T.P. <br />Same at Alternative 3 but <br />-consider inclusion of flow <br />from Harbor Island <br />New Vera Cruz pump station <br />receiving flows from Pebble <br />Bay North and South, Vera <br />Cruz Condominiums, Sea Watch <br />and Pebble Beach Villas <br />Condominiums. Pumping to <br />City of Vero Beach system. <br />Includes 2,000 ft. of 6" <br />force main at $6.25 per ft. <br />Same as Alternative No. 5 but <br />consider inclusion of flow <br />from Harbor Island pumping to <br />City of Vero Beach system. <br />Includes 2,000 ft. of 6" <br />force main at $6.25 per ft. <br />$ 3,000 <br />$35,000 <br />$36,000 <br />$55,800 <br />$56,500 <br />Not applicable - <br />station cannot handle <br />additional flow. <br />Not applicable - does <br />not consider Harbor <br />Island flow. <br />$10,000 <br />Not applicable - does <br />not consider Harbor <br />Island flow. <br />* NOTE: The pro rata share does not include any cost associated with the <br />required wastewater treatment plant improvements. It is recom- <br />mended a separate pro rata share determination be made for the <br />treatment plant improvements. <br />� ® r <br />
The URL can be used to link to this page
Your browser does not support the video tag.