Laserfiche WebLink
Addendum No. 1 <br />Indian River County <br />201 Facilities Plan <br />January, 1979 <br />Page -three- <br />SECTION 16.2.4 WASTE TREATMENT TECHNIQUES <br />Page 16-11, Fourth paragraph, second sentence: Delete this <br />sentence and substitute the following: <br />"The current wastewater allocations allow for a TN dis- <br />charge of 20.0 mg/1 at both the Vero Beach and North County <br />plants and a TP discharge of 7.0 mg/l at the Vero Beach <br />Plant and 10.0 mg/1 at the North County Plant." <br />� <br />JUN 181980 411Y <br />SECTION 20.2.2 TRANSMISSION SYSTEM <br />Page 20-6: Delete second paragraph in its entirety and sub- <br />stitute the following paragraph: <br />"All wastewater flows generated in the unicorporated areas <br />north of the city limits of Vero Beach will be routed to <br />the proposed plant "B" in the first phase. The City of <br />Vero Beach will provide sewer services for the Indian <br />River County Hospital until such time as the County can <br />provide retail water services. At such time and upon the <br />approval of the Board of Trustees of the hospital, the <br />County will take on the responsibilities of providing <br />both water and sewer services to the hospital. If the <br />Board of Trustees do not wish to'be served by the County, <br />then it will be the responsibility of the City of Vero <br />Beach to provide both water and sewer services to the <br />hospital as set forth in their current agreement." <br />EXHIBIT 20-2 <br />Page 20-7: Add a 10 -inch line from P.S. No. 24 going east <br />across the Wabasso Bridge (not shown) and through the Town of Orchid <br />and terminate the 10 -inch line with Pump Station No. 42 at the <br />intersection of State Route 510 and State Route A -1-A. A rLvised <br />copy of Exhibit 20-2 is attached to this addendum. <br />L.. <br />TABLE 20-3 TRANSMISSION SYSTEM CONSTRUCTION COST ESTIMATES <br />Page 20-17: Replace Table 20-3 with Revised Table 20-3 <br />(6-5-80) attached to this addendum. - <br />TABLE 20-6 SUMMARY OF CONSTRUCTION COST ESTIMATES <br />` <br />Page 20-20: Replace Table 20-6 with Revised Table 20-6 <br />(6-5-80) attached to this addendum. <br />L <br />� <br />JUN 181980 411Y <br />