Laserfiche WebLink
..�,� > r t•.�:.y ; -;•,`- ;.:. .." :. .. .. '. :., r• .-.>.;cT-. .. �:.u.;ti.:.•:+gY.'.�+/k'.. awn+aF5 fir.,-: <br />Addendum No. 1 <br />Indian River County <br />201 Facilities Plan <br />January, 1979 <br />Page -four- <br />SECTION 22.1 INSTITUTIONAL RESPONSIBILITIES <br />Page 22-1, Second Paragraph: Delete this paragraph in its en- <br />tirety and substitute the following paragraph in its place: <br />"The Board of County Commissioners will provide access <br />to the County Plant to the municipalities of Fellsmere, <br />Orchid and Sebastian via a major transmission system de- <br />scribed in Chapter 20 of this report. The County will be <br />responsible for the construction and maintenance of all <br />major transmission.systems within the incorporated areas <br />of the County. All pump stations and transmission lines <br />within the incorporated areas of the County which trans- <br />port wastewater to the County's receiving pump stations <br />are considered minor transmission systems and the muni- <br />cipalities involved are responsible for their construction <br />and maintenance:. The County will be responsible for the <br />construction and maintenance of all systems within the <br />unincorporated.areas of Indian River County. All trans- <br />mission lines shown in the 201 Facilities Plan are major <br />transmission systems and are the responsibility of the <br />County." <br />Page 22-1: Insert the following paragraph at the bottom of <br />the page: <br />"It is proposed that Indian River Shores be responsible <br />for constructing and maintaining any force mains and pump <br />stations required within their city limits to transport <br />waste to the Vero Beach transmission system and that the <br />City of Vero Beach provide wastewater treatment to the <br />City of Indian River Shores. However, this will have to <br />be worked out and finalized by the interlocal agreements." <br />TABLE 22-1 CALCULATION OF LOCAL SHARE OF COSTS <br />Page 22-3: Replace Table 22-1 with Revised Table 22-1 (6-5-80) <br />attached to this addendum. <br />TABLE 22-3 ESTIMATED IMPLEMENTATION SCHEDULE <br />Page 22-8 through 22-10: Replace Tables 22-3 with Revised <br />Table 22-3 (6-5=80) attached to this addendum. <br />M <br />4- <br />