Laserfiche WebLink
IMPLERENTATION PLAN (Figure 1) <br />a�� + <br />Phase I (Completion 3 Months After Acquisition) <br />=.L <br />Clean up grounds, paint external surfaces of building, remove <br />campus. Plans are to equip this facility to accommodate 25-35 <br />unusable structures, renovate fence, check and repair roofs <br />on <br />researchers and graduate students at any one time. <br />Buildings ld 2 •,waw. <br />� <br />Estimated Cost: $30, 000 .6-�-# �.- �� 3 4 D*hett g-%�2f} <br />B. <br />(1) Educational Utilization <br />C®uNr�( <br />Phase II (Completion Within 15 Months of Acquisition) <br />e •. <br />a) There are 5070 students enrolled in the uni rsity <br />Complete renovation of Building #1 Resoarch Labcr•ftory consistent <br />as of the date of this application. <br />i'. <br />building within 15 to 18 months of acquisition. <br />(b) The are no classes operating in ergency facilities, <br />ctyyt;t <br />double r split shifts, etc. <br />Phase III (C',•.:-plet.ion Within 36 Months of X yj1::itfon) <br />.!"I r <br />Complete renovation of Building #2 Resident Director's Ffcil_ity, <br />(c) The average rollment p classroom unit is 28. <br />• <br />r <br />, ;t: <br />(d) The faculty consis of 154 members. Excluding <br />:scci•,isitirn. <br />units in which e wou not expect to find faculty <br />�` <br />members wit erminal deg es, such as library, <br />:e •:,��Y: :• <br />ROTC et , 81% of the F.I. faculty hold the <br />earne octoral degree. <br />41 <br />4 <br />JUN 2 51984 <br />. 6. <br />�•it��:., <br />43 fAcE-89B <br />(2) Heal Utilization Not Applicable <br />C. <br />Th eed,for this property does not stem from any eme ency <br />fhiw� <br />r. S <br />esulting from aj*disaster. <br />'�.. <br />D.. <br />The need is not the result of any requirement to meet or <br />comply with established State standards. <br />E. <br />The university has no other real estate suitable for the <br />proposed program of utlization. <br />x... ., <br />5. Physical Layout, Plans and Cost Estimates <br />IMPLERENTATION PLAN (Figure 1) <br />ti <br />Phase I (Completion 3 Months After Acquisition) <br />=.L <br />Clean up grounds, paint external surfaces of building, remove <br />unusable structures, renovate fence, check and repair roofs <br />on <br />Buildings ld 2 •,waw. <br />� <br />Estimated Cost: $30, 000 .6-�-# �.- �� 3 4 D*hett g-%�2f} <br />d e Acte dto <br />C®uNr�( <br />Phase II (Completion Within 15 Months of Acquisition) <br />e •. <br />Complete renovation of Building #1 Resoarch Labcr•ftory consistent <br />with drawings included with application 11gure 2). Occupy <br />building within 15 to 18 months of acquisition. <br />Estimated Cost: $160,000 <br />Y N� <br />i t <br />Phase III (C',•.:-plet.ion Within 36 Months of X yj1::itfon) <br />.!"I r <br />Complete renovation of Building #2 Resident Director's Ffcil_ity, <br />(Figure 3) .,nd--�iRildlrtg 93 '4-•4kng-Fe-it•ij# je pfid pi 't+at-P <br />S E .7 e .. F04 7 1 :.- . (:P 4 e 44. Occupancy w i th In 36 r•ant?is of <br />:scci•,isitirn. <br />}�- <br />F,st:. ft• d G� •t: $60,100 �-• � }•- a..�f.(, 3. <br />#' <br />41 <br />4 <br />JUN 2 51984 <br />. 6. <br />Boa <br />43 fAcE-89B <br />