My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/25/1980
CBCC
>
Meetings
>
1980's
>
1980
>
6/25/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 12:08:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/25/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />MR. KONTOULAS STATED IT COULD NOT BE DONE BECAUSE OF THE <br />EXISTING ROOF CONDITIONS; IT WOULD NOT ADHERE. <br />COMMISSIONER LYONS ASKED WHAT IT WILL COST US IN HEATING <br />AND COOLING TO GO FROM THE REFLECTIVE TO THIS VINYL ROOFING WHICH <br />IS DARK AND ONLY HAS THE LOOSE GRAVEL OVER IT. <br />MR. KONTOULAS ASSUMED THAT THE HEAT GAIN, ETC., HAD BEEN <br />WORKED OUT. <br />MR, KONTOULAS WENT ON TO CHANGE ORDER PROPOSAL #2 WHICH <br />INVOLVES 46 LIGHT FIXTURES WHICH WERE REMOVED MISTAKENLY BY OUR <br />MAINTENANCE PEOPLE. THE COST TO REPLACE THEM IS A TOTAL OF $2,228. <br />ASSISTANT ADMINISTRATOR NELSON EXPLAINED THAT THEY WERE <br />SALVAGING EVERYTHING THEY COULD TO PUT NEW LIGHTS IN THE WAREHOUSE <br />USED BY THE SUPERVISOR OF ELECTIONS. THESE LIGHTS WERE TAKEN FROM <br />THE WRONG AREA, AND IT WAS NOT DISCOVERED UNTIL IT WAS TOO LATE, <br />MR. KONTOULAS STATED THAT CHANGE ORDER PROPOSAL #3 RELATES <br />TO INDIVIDUAL FAN COIL UNITS SHOWN ON THE ORIGINAL BLUEPRINTS OF THE <br />SECOND FLOOR OF THE OLD HOSPITAL BUILDING. APPARENTLY, SOME OF THESE <br />WERE NEVER PUT IN. MR. KONTOULAS SUGGESTED TO THE ARCHITECT THAT <br />SINCE WE DO HAVE THREE UNITS IN THAT AREA, POSSIBLY ONE UNIT COULD <br />HANDLE TWO ADJOINING AREAS. HE STATED THAT HE HAS NOT HAD A REPLY. <br />BUT PERSONALLY FEELS THE MISSING UNIT WOULD NOT HAVE TO BE PUT IN.- <br />AND <br />N.AND HE WOULD RECOMMEND THAT THE BOARD NOT APPROVE THIS CHANGE ORDER <br />AT THIS TIME. HE DID WISH TO HAVE APPROVAL ON CHANGE ORDERS #1 AND #2. <br />COMMISSIONER LYONS SUGGESTED THAT WE DETERMINE WHAT THE <br />AFFECT WOULD BE ON THE AIR CONDITIONING BEFORE WE APPROVE CHANGE <br />ORDER #1 REGARDING THE NEW TYPE ROOFING. <br />MR. KONTOULAS EXPLAINED THAT HE WOULD LIKE THE BOARD TO <br />APPROVE THE CHANGE ORDER BECAUSE WE ARE IN THE RAINY SEASON AND IT <br />WILL AFFECT CONSTRUCTION. HE AGREED IT IS AN IMPORTANT FACTOR, BUT <br />IT IS A NO COST FACTOR, AND, IN ADDITION, IT COULD BE A TIME DELAY <br />FOR THE CONTRACTOR. <br />COMMISSIONER LYONS NOTED THAT THERE IS NO COST TODAY, BUT <br />HE FELT WE ARE BEING STAMPEDED INTO APPROVING THIS WITHOUT KNOWING <br />THE EFFECT. <br />• �-EGO � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.