Laserfiche WebLink
JUL 161980 <br />aoox 44 PAGE -90 <br />MR. ROBBINS STATED THE JOINT VENTURE CONSIDERED THE BID <br />FROM ALSAY-PIPPIN CORPORATION TO BE ACCEPTABLE, AND RECOMMENDED THE <br />BID BE AWARDED TO THEM, HE ADDED THAT THE FIRST PHASE OF THE CONTRACT <br />REQUIRES THREE PRODUCTION WELLS, AND THIS PROGRAM WAS GEARED TO RECEIVE <br />A CONSUMPTIVE USE PERMIT. MR. ROBBINS COMMENTED THAT THIS'IS A TEST <br />WELL PROGRAM AND AFTERWARDS, CAN BE USED AS PRODUCTION WELLS. HE <br />NOTED THAT THE INFORMATION THEY RECEIVED FROM ALSAY-PIPPIN IS THAT <br />THE THIRD PRODUCTION WELL CAN BE ADDED ON TO THE CONTRACT, <br />DISCUSSION FOLLOWED AND IT WAS DETERMINED THAT THE .JOINT <br />VENTURE WOULD LIKE TO GET TOGETHER WITH THE ATTORNEY TO INCORPORATE <br />THIS PROGRAM INTO THEIR ORIGINAL CONTRACT, <br />ON MOTION BY COMMISSIONER LYONS, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY ACCEPTED THE BID OF ALSAY-PIPPIN CORPORATION <br />IN THE AMOUNT OF $116,802 FOR THE TWO TEST PRODUCTION WELLS, AND A <br />MONITORING WELL, AS OUTLINED IN THE SPECIFICATIONS. <br />MR. ROBBINS NEXT DISCUSSED WITH THE BOARD THE FOLLOWING <br />FEASIBILITY REPORT REGARDING WATER FOR THE PROPOSED OSLO SCHOOL: <br />FEASIBILITY REPORT <br />FOR <br />COUNTY WATER SERVICE TO THE PROPOSED <br />OSLO AREA SCHOOL <br />Prepared For <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTY COPMIISSIONERS <br />By <br />SVERDRUP & PARCEL AND ASSOCIATES, INC. <br />and <br />BEINDORF AND ASSOCIATES, INC. <br />(A Joint Venture) <br />Engineer's Project No. 6383A <br />July 16, 1980 <br />