My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/16/1980
CBCC
>
Meetings
>
1980's
>
1980
>
7/16/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 12:11:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/16/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- M M <br />Introduction: At the request of the Board of County Commissioners, the Joint <br />Venture has evaluated the feasibility of supplying water to the proposed <br />school to be located south of Oslo Road. <br />After review of all available facts and data, we find it is feasible to <br />furnish potable water to the proposed school from the proposed South <br />County Water System utilizing the Vista Properties' water treatment plant <br />on an interim basis. To furnish water to the school, the following pro- <br />gram is recommended: <br />1. County to acquire the Vista Properties' Franchise to include the Vista <br />water plant. <br />2. County to construct a portion of the proposed South County Water Trans- <br />mission System as an interim project. The proposed transmission system <br />would run from the Vista Properties plant, south on U.S. 1 to Oslo Road, <br />west on Oslo Road to the proposed water treatment plant site. A line <br />would be extended from the proposed treatment plant site to the proposed <br />school. The line would be sized to provide fire protection for the <br />school. <br />To complete the above listed program and to provide water to the school by <br />July 1, 1981, the following schedule is offered for consideration: <br />PRELIMINARY PROJECT SCHEDULE <br />Item <br />PRELIMINARY <br />Target Date <br />I. Complete design of plans <br />and specifications <br />A. Construction Cost: <br />(will require 65-75 days <br />to complete engineering) <br />December 1, 1980 <br />2. Advertise for bids <br />Site <br />December 1, 1980 <br />3. Complete interim financing <br />arrangements <br />December 1, 1980 <br />4. Open bids for project <br />Cost <br />January 2, 1981 <br />5. Award contract and begin <br />construction <br />February 1, 1981 <br />6. Complete construction and <br />provide water service <br />18" DI pipe <br />to school <br />28/L.F. <br />July 1, 1981 <br />In an effort to advise the Board of Commissioners of the cost of this project, <br />the following preliminary project cost is presented. <br />b. Water Treatment Plant Site to Proposed School <br />Item Quantity Unit Cost Cost <br />1. 8" PVC 1,400 Ft. $8.50 L.F. $ 11,900 <br />2. Valves and Fittings Lump Sum 2,500 <br />3. Fire Hydrant Assembly Lump Sum 1,500 <br />Construction Cost . . . . . $ 15,900 <br />TOTAL CONSTRUCTION COST . . . . . $533,300 <br />43 <br />800!( <br />JUL 161900 <br />' 44 PAGE. 9�. <br />PRELIMINARY <br />PROJECT COST <br />A. Construction Cost: <br />a. Vista Properties to Proposed Treatment Plant <br />Site <br />Item <br />Quantity <br />Unit Cost <br />Cost <br />1. <br />12" PVC pipe <br />3,000 Ft. <br />$ 14/L.F, <br />$ 42,000 <br />2. <br />18" DI pipe <br />4,050 Ft. <br />28/L.F. <br />113,400 <br />3. <br />20" DI pipe <br />8,700 Ft. <br />35/L.F. <br />304,500 <br />4. <br />12" DI pipe <br />cased crossing U.S. 1 <br />150 Ft. <br />150/L.F. <br />22,500 <br />5. <br />20" DI pipe cased <br />crossing FEC Railroad <br />100 Ft. <br />150/L.F. <br />15,000 <br />6. <br />Valves and Fittings <br />Lump Sum <br />20,000 <br />Construction <br />Cost <br />$517,400 <br />b. Water Treatment Plant Site to Proposed School <br />Item Quantity Unit Cost Cost <br />1. 8" PVC 1,400 Ft. $8.50 L.F. $ 11,900 <br />2. Valves and Fittings Lump Sum 2,500 <br />3. Fire Hydrant Assembly Lump Sum 1,500 <br />Construction Cost . . . . . $ 15,900 <br />TOTAL CONSTRUCTION COST . . . . . $533,300 <br />43 <br />800!( <br />JUL 161900 <br />' 44 PAGE. 9�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.