Laserfiche WebLink
IS NO WAY TO GET TO IT WITHOUT USING STREETS IN COLONIAL TERRACE, <br />IN SPITE OF THE FACT THAT HE WAS WELL AWARE OF THE BOARDS OBJECTIONS <br />TO THE ROUTING OF TRAFFIC THROUGH COLONIAL TERRACE, AND SHE FELT THIS <br />SHOULD BE LOOKED INTO. <br />1980 PROPOSED RESURFACING PROGRAM - PARTIALLY APPROVED <br />ADMINISTRATOR JENNINGS PRESENTED THE BOARD WITH THE FOLLOWING <br />LIST OF ROADS PROPOSED FOR RESURFACING BEFORE THE NEXT BUDGET YEAR: <br />July 29, 1980 <br />MEMORANDUM <br />TO: Board of County Commissioners <br />FROM: County Administrator <br />SUBJECT: Proposed 1980 Resurfacing Program <br />1. The following roads are proposed for resurfacing, starting <br />in August: <br />Old Dixie from 19th St. to So. Relief <br />Canal - widen, level & resurface - 4000 tons $ 148,000 <br />7th St. from 15th to 17th Avenue - 2" <br />surface - 260 tons 9,620 <br />2nd St. from 20th St. to Old Dixie - <br />12" surface - 1760 tons 65,120 <br />17th Ave. from Glendale north 1320 ft. - <br />3/4" surface - 110 tons 4,069 <br />53rd Ave. from S.R. 60 to 22nd St. - <br />12" surface - 219 tons 8,140 <br />505A from S.R. 60 north to So. Gifford <br />Rd. (2 miles) - widen, level & resurface - <br />3050 tons 112,850 <br />505A from 510 south to Hobart Rd. (1 mile) - <br />widen, level & resurface - 1525 tons 56,425 <br />505A*from Hobart Rd. south to North Winter <br />Beach Road (1 mile) - level & resurface - <br />880 tons 32,560 <br />Parking Lot at Garage (250 Sq. Ft.) <br />surface - 538 tons 11,201 <br />North Gifford Rd. (100 ft. E. of <br />U. S. 1 for Traffic Light Actuator Ramp) <br />12" surface - 20 tons $ 740 <br />The Moorings Subdivision - AIA <br />Gallion Dr. (.1 vile) - Reef Rd. to AlA - <br />3/4" surface - 44 tons 1,268 <br />Beacon (.2 mile) - Treasure Lane to Reef <br />Rd. - 3/4" surface - 88 tons 3,256 QQ <br />�©OK �� PAGE �01� <br />JUL 3 0 1980 86 <br />