My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/27/1980 (2)
CBCC
>
Meetings
>
1980's
>
1980
>
8/27/1980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:54 AM
Creation date
6/11/2015 12:18:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F_ <br />AUG 2 71980 <br />Box 44 PACE 389 <br />RIVER SHORES, AND IN THAT, EACH OF THE QUESTIONS WE -ARE TALKING ABOUT; <br />TODAY WERE ADDRESSED AND OTHERS, BUT IT APPEARED TO BE AN IMPOSSIBILITY <br />TO GET ALL THE PARTIES TOGETHER ON THAT CONTRACT; S0, THE PROPOSED <br />CONTRACT HAS BEEN SEPARATED INTO PORTIONS; THE SEWER BETWEEN THE <br />COUNTY AND INDIAN RIVER SHORES; THE WATER TO MID FLORIDA; THE WATER <br />TO SOUTH BEACH; THE WATER IN TiE WHOLESALE AREA ROUND THE HOSPITAL; <br />THESE ARE ALL SEGMENTS OF THAT OVERALL CONTRACT. <br />CHAIRMAN SIEBERT NOTED THAT THERE IS A PROBLEM IN THAT <br />PEOPLE DON T KNOW WHETHER TO PROCEED TO PROVIDE THEIR OWN WATER OR <br />HOLD OFF STILL LONGER WAITING FOR THE COUNTY TO PROVIDE THE WATER. <br />ATTORNEY COLLINS FELT THE ONLY ANSWER IS THAT THE COUNTY IS <br />ATTEMPTING TO SOLVE THE PROBLEM. <br />ENGINEER DISCUSSES SOUTH BEACH WATER LINE <br />ENGINEER ROBBINS REPORTED THAT HE ORIGINALLY PREPARED A <br />REPORT ANALYZING THE COST FOR SERVING THE ENTIRE SOUTH BEACH AND THE <br />COST OF A 2-I/2" LINE TO SERVE 27 RESIDENCES. AT THAT TIME HE WAS <br />WORKING WITH THE CITY STAFF IN DETERMINING WATER REQUIREMENTS AT SOME <br />POINT OF CONNECTION, BUT HE IS NOW NOT SURE THAT THOSE INITIAL <br />CONDITIONS EXIST IN THE SAME CONDITION THEY DID BEFORE. HE STATED <br />THAT HE WOULD FEEL A LOT MORE COMFORTABLE IF HE COULD GO BACK AND MEET <br />WITH THE CITY AND GET MORE UP-TO-DATE HYDRAULIC INFORMATION SO THAT <br />WHEN WE GET DOWN TO SPECIFIC SIZES, HE CAN GIVE THE BOARD MORE UP-TO- <br />DATE INFORMATION. <br />COMMISSIONER LYONS COMMENTED THAT A POINT NOW HAS BEEN BROUGHT <br />UP IN CONNECTION WITH THE INDIAN RIVER SHORES/VERO BEACH SEWER AGREE- <br />MENT AS TO WHETHER OR NOT THERE SHOULD BE SOME SORT OF A TIME EXPIRA- <br />TION DATE ON THE AGREEMENT. HE STATED THAT HE PERSONALLY HAS SOME <br />TROUBLE WITH THIS AND WISHED THE BOARDS REACTION. HE NOTED THAT <br />THE PROPOSAL WAS THAT THERE WOULD BE NO TIME LIMIT FOR THE UNINCORPO- <br />RATED AREAS; IN OTHER WORDS, THE CITY OF VERO BEACH WOULD TAKE THAT <br />AS A TERRITORY AND IT IS THEIRS TO SERVE. THE OTHER PROPOSAL WAS THAT <br />ANY SERVICE WITHIN THE TOWN OF INDIAN RIVER SHORES WOULD BE FOR SOME <br />4W <br />
The URL can be used to link to this page
Your browser does not support the video tag.