Laserfiche WebLink
_I <br />SEP 10 1980 Box 44 PAGE <br />547 <br />STATUS REPORT - GIFFORD,SEWAGE TREATMENT PLANZ <br />ENGINEER JOHN ROBBINS REPORTED THAT HE RECEIVED A COPY OF <br />THE ENGINEERING REPORT ON THE SOILS AT THE PROPOSED GIFFORD SEWAGE <br />TREATMENT PLANT SITE AND HAS BEEN REVIEWING THIS WITH MR. BOSTWICK <br />OF THE DER ALL MORNING. BASICALLY, THE REPORT INDICATES THAT THE <br />SOIL IS SUITABLE FOR PERCOLATION PONDS, WHICH IS OF GREAT INTEREST <br />BECAUSE THIS TYPE OF EFFLUENT DISPOSAL REQUIRES LESS LAND. HE CON- <br />TINUED THAT HE HAS DONE A PRELIMINARY DESIGN FOR INSTALLATION OF ONE <br />100,000 GPD PLANT AND TWO EFFLUENT DISPOSAL PONDS, WHICH WOULD HANDLE <br />UP TO 100,000 GPD EACH. MR. ROBBINS NOTED THAT THE DER RECOMMENDS <br />A BACKUP POND, AND HE FELT THERE IS EVEN ROOM FOR A THIRD POND TO <br />HANDLE UP TO 100,000 GPD. HE INFORMED THE BOARD THAT SHOULD THE <br />PLANT AT PEBBLE BAY BE TAKEN OUT OF SERVICE, IT COULD BE RELOCATED <br />TO GIFFORD, AND WITH MODIFICATION, YOU COULD HAVE TWO 100,000 GPD <br />PLANTS OPERATING PARALLEL. <br />MR. ROBBINS CONTINUED THAT, BY ROUGH CALCULATION, WE NEED <br />ABOUT 12 ACRES OF LAND THE DER RECOMMENDS THAT THE WATER TREATMENT <br />PLANT ON THE PROPOSED SITE BE ABANDONED, AND MR. ROBBINS' RECOMMENDA- <br />TION WOULD BE TO ABANDON THE PLANT AND PLUG THE WELL. HE NOTED THAT <br />IF THE COUNTY WANTS TO GO AHEAD ON THIS SCHEME, WE NEED TO WRITE <br />REQUESTING THE RELOCATION, SEND IN THE SOILS REPORT, AND KEEP IN <br />MIND THAT THE DER WILL KEEP US TO THE ORIGINAL CONSTRUCTION SCHEDULE <br />ON THE FIRST PERMIT ISSUED, WHICH HAS ABOUT FIVE MONTHS LEFT. MR. <br />ROBBINS REPORTED THAT HE HAS INCLUDED IN THE 12 ACRES ENOUGH BUFFER <br />TO ALLOW THE ADJOINING OWNER FULL USE OF HIS LAND. HE RECOMMENDED <br />THAT THE ATTORNEY BE AUTHORIZED TO NEGOTIATE AND FELT WE NEED A <br />LETTER OF INTENT. <br />COMMISSIONER LYONS FELT THAT IN ORDER TO AVOID ANY PROBLEM, <br />WE SHOULD LET THE PUBLIC KNOW AS RAPIDLY AS POSSIBLE THAT THIS IS <br />THE SITE WE PLAN TO USE, AND HE WOULD LIKE TO ADVERTISE AND HAVE A <br />PUBLIC HEARING. <br />ATTORNEY COLLINS FELT THERE WILL BE PLENTY OF TIME TO DO <br />THAT AFTER THE CONTRACT IS SIGNED. HE INQUIRED ABOUT THE PROBLEMS <br />INVOLVED IN GETTING WATER TO THAT SITE. <br />111 <br />� s r <br />