Laserfiche WebLink
DOCUMENT IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />12.14. REGIONAL RESIDUALS DEWATERING FACILITY OPERATIONS CONTRACT <br />EXTENSION <br />MOTION WAS MADE by Commissioner Wheeler, <br />SECONDED by Commissioner Davis, to approve the <br />contract extension with Synagro South, LLC for a <br />maximum of six (6) months through August 31, 2010. <br />Director Olson advised that the operations of the new County sludge/septic dewatering <br />facility being constructed at the Landfill are being put out to bid. However, there is a two-month <br />gap between the expiration of the existing contract with Synagro South, LLC, and the start up of <br />the new facility, and Synagro has agreed to honor their existing contract in order to maintain <br />operations through the transition period between the existing and new facilities. <br />The Chairman CALLED THE QUESTION, and the <br />Motion carried unanimously. The Board approved and <br />authorized the Chairman to execute the contract extension <br />with Synagro South, LLC, for a maximum of six (6) <br />months through August 31, 2010 (for sludge dewatering <br />and hauling services at the Landfill), as presented and <br />recommended in the memorandum of December 22, 2009. <br />CONTRACT EXTENSION IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />12...5. REUSE RATE STUDY/RATE RECOMMENDATION <br />Assistant Director of Utility Services Cindy Corrente recalled that on July 21, 2009, the <br />Board had granted approval for Camp Dresser and McKee (CDM) to conduct a Reclaimed Water <br />26 <br />January 5, 2010 <br />