My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/24/1980 (2)
CBCC
>
Meetings
>
1980's
>
1980
>
9/24/1980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:54 AM
Creation date
6/11/2015 12:25:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Fire Commissioners
Document Type
Minutes
Meeting Date
09/24/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMISSIONER LOY FELT THAT THE BOARD HAD INDICATED THAT <br />THIS IS A PRIORITY INTERSECTION, AND IT IS BUDGETED FOR IN NEXT <br />YEAR'S BUDGET, <br />ATTORNEY COLLINS NOTED THAT WE NEED AN AGREEMENT ABOUT <br />THE EASEMENT, AND HE WILL DRAW IT UP. <br />ON MOTION BY COMMISSIONER LYONS, SECONDED BY COMMISSIONER <br />WODTKE, THE BOARD UNANIMOUSLY ACCEPTED THE ADMINISTRATORS RECOM- <br />MENDATIONS FOR THE TRAFFIC SIGNAL AT THE CORNER OF 20TH AVENUE AND <br />16TH STREET AND INSTRUCTED THAT THE NECESSARY ARRANGEMENTS BE MADE <br />FOR THE EASEMENT. <br />ADMINISTRATOR NELSON NEXT REPORTED THAT THE TRAFFIC SIGNAL <br />INSTALLED AT ROSELAND ROAD AND U.S. I HAS A GREEN LEFT -TURNING ARROW. <br />WHEN IT GOES OFF, IT GOES INTO RED. HE HAS HAD A NUMBER OF CALLS <br />FROM ROSELAND RESIDENTS COMPLAINING ABOUT HAVING TO WAIT THROUGH <br />THE ENTIRE SEQUENCE WHEN THERE IS NO TRAFFIC COMING. SIGNAL CON- <br />STRUCTION CAN MODIFY THE SIGNAL AND CURE THIS PROBLEM FOR A COST OF <br />ABOUT $1,500, AND MR. NELSON RECOMMENDED THAT THEY BE ALLOWED TO <br />DO THIS WORK. <br />ON MOTION BY COMMISSIONER WODTKE, SECONDED BY COMMISSIONER <br />LYONGS, THE BOARD UNANIMOUSLY ACCEPTED THE RECOMMENDATION OF THE <br />ADMINISTRATOR IN REGARD TO MODIFICATION OF THE TRAFFIC SIGNAL AT <br />ROSELAND ROAD AND U.S. 1. <br />REQUEST FOR EXTENSION OF TIME TO PRESENT PERFORMANCE BOND - COMPASS <br />BUILDING SYSTEMS RE WABASSO BEACH PARK - GRANTED <br />ADMINISTRATOR NELSON INFORMED THE BOARD THAT WAYNE BAKER <br />OF COMPASS BUILDING SYSTEMS HAS HAD AN ADMINISTRATIVE DIFFICULTY <br />IN MEETING HIS BOND REQUIREMENTS WITHIN THE TIME LIMIT SET BY THE <br />BOARD AND HAS REQUESTED A TIME EXTENSION AS PER THE FOLLOWING LETTER: <br />107 <br />SEP 2 41980 BQOK 44 FACE687 <br />
The URL can be used to link to this page
Your browser does not support the video tag.