My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/8/1980
CBCC
>
Meetings
>
1980's
>
1980
>
10/8/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:54 AM
Creation date
6/11/2015 12:30:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/08/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L-7 <br />COMMISSIONER WODTKE ASKED IF THERE WERE ANY CREDITS. <br />MR. KONTOULAS ADVISED HE RECEIVED ONE TODAY FOR $19 WHICH <br />WAS AN OVERCHARGE; AND ANOTHER FOR $2,100 WHICH WAS THE DELETION OF <br />THE THREE MANHOLES AROUND THE NEW COMMISSION ROOM. HE CONTINUED THAT <br />THE SEWER LINE AND THE MANHOLES WERE NEVER PUT IN, AND THE EXISTING <br />SEWER LINE IS NOT OWNED BY THE CITY. MR. KONTOULAS STATED THAT <br />MAXWELL PLUMBING HAD THE SEWER LINE X-RAYED, IT HAS BEEN CLEANED AND <br />IT IS BEING USED. HE ADDED THAT THE COUNTY OWNS THAT PORTION OF THE <br />SEWER. MR. KONTOULAS NOTED THAT HE ASKED THE CONTRACTOR FOR A MORE <br />COMPLETE BREAKDOWN OF CREDITS,AND IT SHOULD BE FORTHCOMING. <br />CHAIRMAN SIEBERT COMMENTED THAT A GREAT DEAL OF CREDIT IS <br />DUE MR. KONTOULAS FOR THE FINE JOB HE WAS DOING, AND FOR HIS EXCELLENT <br />REPORTS. <br />MR. KONTOULAS ADVISED THAT THE COURTHOUSE HAS FOUR MORE <br />MONTHS IN WHICH TO BE COMPLETED, AND SPOKE ABOUT A PROBLEM THAT IS <br />BEING WORKED ON NOW ON THE WEST SIDE OF THE COURTHOUSE ABOVE THE <br />OLD PERSONNEL OFFICE. THERE IS A PROBLEM ON THE ROOF WHERE THERE <br />WAS A SCUPPER WITH A LEADER HEAD WHICH IS NOW 18" BELOW THE NEW <br />LOBBY ROOF. HIS RECOMMENDATION WAS TO GO TO THE WEST SIDE AND PUT <br />A LEADER AND DOWNSPOUT DIRECTLY INTO IT. <br />COMMISSIONER LYONS COMMENTED THAT HE WAS PRESENT AT A <br />MEETING WITH THE ARCHITECT AND CONTRACTOR AND THOUGHT HE HAD DEMONSTRATED <br />THAT THE BOARD IS NOT INTERESTED IN DISCUSSING HOW MUCH IT WAS GOING <br />TO COST BECAUSE THEY WERE LATE - JUST WHAT WAS NECESSARY TO DO IN <br />ORDER TO COMPLETE THIS PROJECT. <br />ADMINISTRATOR NELSON FELT THE CHANGE PROPOSALS HAVE BEEN <br />COMPLETED AND THEREFORE, THE ARCHITECT'S TIME IN VERO BEACH HAS BEEN <br />REDUCED TO ONE DAY PER WEEK, WHICH IS A COST SAVINGS. <br />MR. KONTOULAS NOTED THAT THIS IS THE ARCHITECTS TWELFTH <br />WEEK TODAY AND STARTING NEXT WEEK, HE WILL BE ON A ONE DAY A WEEK <br />VISIT. HE ADDED THAT HE HAS NUMEROUS ITEMS THAT HAVE TO BE COSTED <br />OUT OR A CHANGE ORDER DONE. <br />51 <br />BOOK 44 PAGE 847 <br />
The URL can be used to link to this page
Your browser does not support the video tag.