Laserfiche WebLink
_I <br />OCT 81980 <br />EXHIBIT "A" <br />TO <br />SUPPLEMENTAL AGREEMENT NUMBER 3 <br />TO <br />JOINT PASTER CONSULTING AGREEMENT <br />Bou 44 PaUE 852 <br />SCOPE OF SERVICES: <br />The following services will be provided for the study area <br />as determined in the Phase I - Preliminary Report document. These <br />services include: <br />1. Prepare Piaster Drainage Plan for interim and long-range capital <br />improvements program. <br />a. Coordination with Indian River Farms Water Control District to <br />establish operation schedule. <br />b. Criteria.development for proposed plan to include hydrologic <br />(i.e. rainfall, land use, etc.) and hydraulic (i.e. tailwater <br />conditions). <br />c. Environmental evaluation to insure compatibility of proposed' <br />pian. <br />d. Determination of existing drainage condition. <br />J. PHASE I basin delineation verification based on completed <br />aerial photogrammetry. <br />ii. PHASE I hydraulic data.base (County) updated based on com- <br />pleted aerial photogrammetry and field survey. <br />iii. Computer simulation of existing drainage conditions based <br />on PHASE I- report to establish discharge criteria for dev- <br />eloprent of Piaster, Plan. <br />e. Develop conceptual alternative for testing based on existing <br />conditions simulation, land use, topography, etc. <br />f. Test long-range alternatives. <br />i. Assessment of hydrologic data based on future land use <br />planning. <br />ii. Computer simulation of design alternatives based on <br />criteria established above. <br />