Laserfiche WebLink
OCT 81980 <br />BOOK 44- PAGE 870 <br />WAS TO MATCH THE KEYING SYSTEM WITH THE ANNEX. HE ADDED THAT THE <br />ANNEX AND THE COURTHOUSE WILL HAVE KEY—IN SYSTEMS AND WILL BE UNDER <br />ONE GRAND MASTER LOCK; THERE WILL BE SOMEONE DESIGNATED TO ISSUE <br />KEYS ON THE OLD EXISTING DOORS. <br />CHAIRMAN SIEBERT NOTED THAT THE $2,000 ALLOWANCE ACTUALLY <br />IS COSTING THE COUNTY $10,000. <br />COMMISSIONER WODTKE FELT THIS WAS SOMETHING THAT THE <br />ARCHITECTS SHOULD HAVE KNOWN ABOUT. <br />ADMINISTRATOR NELSON ADVISED THAT THE $2,000 ALLOWANCE WAS <br />WHAT THE ARCHITECTS ESTIMATED INITIALLY, BUT AFTER THE CONTRACT WAS <br />LET, IT WAS DETERMINED THAT THERE ALSO MUST BE SOME NEW HARDWARE. <br />MR. KONTOULAS RECOMMENDED APPROVING CHANGE ORDER #2 IN <br />ORDER TO AVOID ANY DELAYS IN OBTAINING THE HARDWARE. <br />CHANGE <br />OWNER <br />n <br />Highway <br />ARCIill I.CI <br />U <br />ORDER <br />CONTRACTOR <br />n <br />--- <br />FIELD <br />[] <br />AIA 00CUM[NT 6701 <br />OTIIFR <br />_�i•(� <br />PROJECT: Indian River County <br />(name, address` County Courthouse <br />Vero Beach, Florida <br />TO (Contractor) <br />(^ Reinhold Construction Inc. <br />P.O,Box 666 <br />Cocoa, Florida 32922 <br />CHANGE ORDER NUMBER: 2 (two) <br />ARC:h I'I LC 1'S PROJLC 1 NO: 9364 <br />CON 1 RACT FOR: Additions and <br />Renovations <br />CONTRACT DATE: April 2, 1980 <br />You are directed to make the following changes in this Contract: <br />Add the sum of $8,101.46 to the contract for the <br />Finish Hardware. This is a first line item, that <br />could not be determined at the time of the bid. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ <br />Net change by Previous Change Orders . . . . . . . . . . . . . . . . . . $ <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ <br />The Contract Sur) will be (increased) by this Change Order . . . $ <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />1fie Date of ( onipletron as of the date of this C h,llige Older therefore r. <br />COt1NF l- MFTCALF F <br />EDDY <br />'N)Y tl�outh Dixie <br />Highway <br />Address <br />Coral Gables Flo <br />ida,3313►i <br />BY --�—, <br />--- <br />Vero hea,eh, <br />DATE Q /1-t�2) <br />689,000.00 <br />441.27 <br />689,441.27 <br />8,101.46 <br />697,542.73 <br />{ 0 ) pays <br />N/A <br />RFINIl0I.D CONSTRUCTION INC. INDIAN RIVFR COUNTY COrMl:;(�It1N <br />b.Kox 666 <br />14th <br />Avenue <br />Addre,> <br />Address <br />Cocoa, Flor i da <br />379?? <br />Vero hea,eh, <br />F for i d,l 3 <br />Y_BY- <br />_�i•(� <br />/0 <br />_DATE <br />` /Li <br />``� . z o <br />ALA DOCU9 CHANCE ORDER • APRIt 19'0 IL)ITI(1N • -m 19%0 • 1NE <br />AMERICA, I1STI U1° C)f ARCHITECTS, 1735 NEVV YORK ASE., NW. WASHINGTON, D.C. 20006 <br />L PAUL <br />