My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/8/1980
CBCC
>
Meetings
>
1980's
>
1980
>
10/8/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:54 AM
Creation date
6/11/2015 12:30:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/08/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Courthouse - Hardware Cost Breakdown <br />Submitted by Reinhold Construction at a meeting 9-30-30. <br />Those present were Pat Lyons,Neil Nelson, Fred Kirsch, <br />Tom Barber, Hercules Kontoulas, Buddy Foxworth, Paul Reinhold, <br />Lynn Snodgrass. <br />Approved Hardware Schedule -- Material $6,650.00 <br />Labor 2,325.00 <br />ss_,975.00 <br />Allowance -2,000.00 <br />$-X975.00 <br />Overhead and Fee (15°.) 1 ,046.25 <br />$b,021.25 <br />Bond (1%) 80.21 <br />$8, 101.E <br />MR. KONTOULAS THEN DISCUSSED CHANGE ORDER #S IN THE AMOUNT <br />OF $50,655.92 FOR FINISH HARDWARE IN THE COUNTY ADMINISTRATION <br />BUILDING, WHICH IS ABOVE AND BEYOND THE $17,000 ORIGINAL ALLOWANCE <br />IN THE CONTRACT. <br />DISCUSSION FOLLOWED ABOUT FINANCES,AND IT WAS DETERMINED THAT <br />THE CHANGES TO DATE HAVE AMOUNTED ROUGHLY TO $85,000. <br />MR. KONTOULAS STATED HE HAD REVIEWED THE DRAWINGS THREE <br />TIMES AND COMMENTED AT THE TIME THAT THE NEW HARDWARE HAD NEVER BEEN <br />WRITTEN IN. HE ADDED THAT HE BROUGHT THE MATTER UP AGAIN AT THE PRE - <br />CONSTRUCTION MEETING, BUT NOTHING WAS EVER DONE ABOUT IT. MR. <br />KONTOULAS STATED THEY ARE REUSING SOME DOORS AT THE ADMINISTRATION <br />COMPLEX THAT ARE IN GOOD CONDITION - ALL THEY HAVE TO DO IS CHANGE <br />THE CYLINDER TO MATCH THE KEY -IN SYSTEM. <br />COMMISSIONER LYONS COMMENTED THAT WHAT THEY DID NOT DO WAS <br />TO GET THIS MATTER SETTLED PRIOR TO CONTRACT TIME. <br />MR. KONTOULAS ADVISED THAT HE DID HAVE A COMPLETE SHOP <br />DRAWING OF ALL THE HARDWARE. <br />800K RUM 7� <br />OCT 8 198p 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.