My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/8/1980
CBCC
>
Meetings
>
1980's
>
1980
>
10/8/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:54 AM
Creation date
6/11/2015 12:30:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/08/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />OWNER <br />❑ <br />ARCHITI CT <br />n <br />ORDER <br />CONIRACTOR <br />❑ <br />IIN D <br />❑ <br />A1A DOC( W NT 0,701 <br />OTHER <br />PROJECI: Indian River County <br />(name, address) County Administration Building <br />Vero Beach, Florida <br />TO (Contractor) <br />Reinhold Construction Inc. <br />P.o.Box 666 <br />Cocoa, Florida 32922 <br />Bf1UK 44 PAG€2 <br />CI IANGE ORDER NUNVIER: 8 (e i (;ht ) <br />ARCIIITECT'S PROJECT NO: 9363 <br />CONIRACT I OR: Additions and <br />Renovations <br />(_ I CONTRACT DATE: April 2, 1980 <br />You are directed to make the following changes in this Contract: <br />Add the sum of $50,655.92 to the contract for the <br />Finish Hardware. This is a first line item, that <br />could not be determined at the time of the bid, $50,655.92 <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ <br />Net change by Previous Change Orders . . . . . . . . . . . . . . . . . . $ <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ <br />The Contract Sura will he (increased) (r%)4WtXX11 (tiKMA} Ari by thio Change Order . . . $ <br />The new Contract Sum including this Change Order will be . . . . . . . . . . $ <br />The Contract Time will be (uxreased) (decreased) (unchanged) by <br />The Date of Completion a�. of the date of this Change Order therefore is <br />CCNNELL METCALF t -EDDY <br />AU IIll ICT <br />1 20_Sou.th _Dixie Hi.ghway__ <br />Address <br />Coral Gnh1es_,_ FL 331311 <br />1 <br />BY_. _— <br />DATE 10 / 6 <br />REINHOUD_ -CONSTRUCT IOU, -INC.- <br />CON' IRA( <br />INC,_CONTRA( 1`011 <br />P Q__Box <br />Address <br />Cocoa, FL 3?9?2 _. <br />BY <br />DATE fU Lam_ 6 <br />2,748,000.00 <br />24,125.43 <br />2,772, 125.1+3 <br />50,655.92 <br />2,822,781.35 <br />( 0 <br />N /A <br />AND IAN_ R1VER_COUNTY CCMM1SSION <br />OWN IR <br />2145_.__1.1+ th_Av.erw e ---__-- <br />Address <br />Vero Beach. i L�.329601. <br />BY <br />DATE <br />AIA DOCUMENT G701 • CHANCE ORDER • APRIL 1970 EDITION • AIA ' • © 1970 , THE link PACE <br />AmLRICAN INSTITUTE OF ARCHIIEC)S, 1735 NEW NORK AVE., NW, WASHINGTON, D.C. 20006 <br />Indian River County Administration Building - Hardware Cost BreakdDwn <br />Submitted by Reinhold Construction at a meeting 9-30-80. <br />Those present were Pat Lyons, Neil Nelson, Fred Kirsch, <br />Tom Barber, Hercules Kontoulas, Buddy Foxworth, Paul Reinhold, <br />Lynn Snodgrass. <br />Approved Hardware Schedule 7-8-80 - - Material $30,400.00 <br />Labor 6,700.00 <br />Approved Hardware Schedule 8-8-80 - - Material 15,675.00 <br />Labor 7,837.50 <br />0, 12.50 <br />Allowance -17,000.00 <br />S 3+612:50 <br />Overhead and Fee (157) 6,541.88 <br />550,154.39 <br />Bond (l',7) 501.54 <br />S5�9'2 <br />� � i <br />
The URL can be used to link to this page
Your browser does not support the video tag.