Laserfiche WebLink
r <br />OCT 81900 <br />BOOK 44 PAGE 878 <br />AFTER SOME DISCUSSION REGARDING THE ASBESTOS IN THE <br />CEILINGS, THE BOARD STRESSED THAT THEY NEEDED TO GET AN ANSWER ONE <br />WAY OR ANOTHER FROM THE ARCHITECTS. <br />MR. SNODGRASS, OF REINHOLD CONSTRUCTION, INC., ADVISED <br />THAT THEY STILL HAVE DOOR FRAMES TO OBTAIN THAT ARE ON ORDER. <br />MR. REINHOLD THEN DISCUSSED THE PROGRESS OF THE ADMINISTRATION <br />COMPLEX. HE FELT THERE ARE SOME AREAS OF THE BUILDING THAT WILL BE <br />READY AT THE END OF THIS YEAR, BUT OTHER PARTS OF THE BUILDING ARE <br />BEHIND SCHEDULE. MR. REINHOLD STATED THERE ARE SOME PROBLEMS WITH <br />PARTITION LOCATIONS, MATERIALS THAT ARE IN THE WALLS, WALLS THAT <br />ARE NOT STRUCTURALLY SOUND; AND A BEAM THAT NEEDS TO BE REENFORCED. <br />HE COMMENTED THAT THEY HAVE HAD VERY GOOD RESULTS WITH MR. BARBER, <br />OF CONNELL, METCALF & EDDY, WORKING ON THE JOB - BUT THEY STILL HAVE <br />A LOT OF PROBLEMS THEY NEED HELP WITH. <br />ADMINISTRATOR NELSON THOUGHT THAT ALL THE PROBLEM AREAS WERE <br />BEING RESOLVED WITH MR. BARBER. <br />DISCUSSION FOLLOWED ABOUT ALL WORKING TOGETHER TO EXPEDITE <br />THE PROJECTS. <br />COMMISSIONER WODTKE COMMENTED THAT HE WAS NOT AWARE OF THE <br />ARTICLES THAT MR. REINHOLD HAS READ IN THE PRESS; HOWEVER, HE FELT <br />THAT HE HAS THE MOST DIFFICULT CONSTRUCTION JOB THAT HAS OCCURRED IN <br />THIS COUNTY, AND THAT THE BOARD IS FORTUNATE TO HAVE HIM DO THE WORK. <br />HE STRESSED THAT IF THERE ARE PROBLEMS, THE BOARD WANTS TO KNOW ABOUT <br />THEM, AND THERE SHOULD BE MORE DISCUSSIONS OF THIS TYPE. <br />COMMISSIONER LYONS THOUGHT THE BOARD WOULD BE WILLING TO <br />MEET IN SPECIAL SESSION TO DISCUSS THE CONSTRUCTION PROBLEMS,IF <br />NECESSARY. <br />MR, KONTOULAS THOUGHT IT WOULD BE HELPFUL IF HE CAME BEFORE <br />THE BOARD WITH THE OUTSTANDING ITEMS CONCERNING THE PROJECTS; AND <br />ATTORNEY COLLINS AGREED AND THOUGHT IT WOULD NOT TAKE VERY LONG. <br />I "Z <br />