My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/1980 (4)
CBCC
>
Meetings
>
1980's
>
1980
>
10/22/1980 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:55 AM
Creation date
6/11/2015 12:38:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Supervisors
Document Type
Minutes
Meeting Date
10/22/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT 2 2.1980 <br />CHANGE011NER <br />❑ <br />ARCHIL I CT <br />ORDER <br />CONTRACTOR <br />n <br />f ILLD <br />MA DOCUAILNT 6701 <br />OTHER <br />PROJECT: Indian River County <br />(name, address) County Administration Building <br />TO (Contractor) <br />Reinhold Construction, Inc. <br />P. 0. Box 666 <br />Cocoa, FL 32922 <br />BOOK 45 41167 66 <br />CHANGE ORDER NUMBER: -Ten (10) <br />_-1 ARCI 111 ECT'S PROJECT NO: 9463 <br />CONIRACT fOR: Additions and Renovations <br />L CONTRACT DATE: April 2, 1980 <br />You are directed to make the following changes in this Contract: <br />Item 1 CP -4C $ 5,108.68 <br />At owner's request, per letter of 5/9/80 <br />Item 2 CP -4D 3,245.38 <br />This is a first line cost item and was not in the plans at <br />the time of the bidding. <br />Ttcm 3 CP -411 1,900.14 <br />At the owner's request per letter of 5/9/80 <br />Item 4 CP -4I 2,544.87 <br />At the owner's request per letter of 5/22/80 <br />Item 5 CP -10 16,553.18 <br />This was a concealed, unforeseen condition as a result of <br />substandard construction and must be corrected. <br />Item 6 CP -11 11,437.22 <br />This is a first line cost item not on the plans at the $40,789.47 <br />time of hiddTng, as it was antic.illntrd that the City of Vero <br />Beach Electric Company would do the work. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 2,748.000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 78,137.23 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 2,826,137.23 <br />The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order. . . $ 40, 789.47 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 2, 866, 926.70 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( -0- ) Days. <br />the Date of Completion as of the date of this Change Order therefore is N/A <br />CONNELT,MF,TCALF &_EDDY_ <br />Pf3iN')' T• -Dixie flif;hw1y_.' <br />Address _-- <br />Coral Gable FL 33134 <br />HY-. - - — — - -� <br />DATE_— <br />RETNIIOLD. CONSTRUCTION INDIAN_RUER_COUNTY—COPWSSION <br />CON T RACTOR OWNER <br />P., O. -Box 666------_-�_ 2145—L4th Itvc.----- <br />Address Address <br />Cocoa, FI= 32922_- Vero B ch, F, 29 0 <br />BYBY <br />DATE e,' / 7 J" J DATE <br />Alk DOCUMENT G701 • CHANCE ORDER • APRIL 1970 EDITION • A(A'R' • 0 1970 • THE ONE PAGE <br />AssERICA% 1-%5TIlLl1 Of ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.