My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/1980 (4)
CBCC
>
Meetings
>
1980's
>
1980
>
10/22/1980 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:55 AM
Creation date
6/11/2015 12:38:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Supervisors
Document Type
Minutes
Meeting Date
10/22/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITY DIRECTOR GEORGE LINER INFORMED THE BOARD THAT HE HAS <br />AN EXERPT FROM A REPORT BY ENGINEER JOHN ROBBINS ON THE STATUS OF <br />THE GIFFORD AREA SEWAGE IMPROVEMENTS. THE FINAL PLAN AND SPECS FOR <br />THE REDESIGN OF THE GIFFORD SEWAGE TREATMENT PLANT AND ASSOCIATED <br />WORK ARE BEING PREPARED IN VERO BEACH. THE ANTICIPATED COMPLETION <br />DATE IS OCTOBER 27TH. MR. LINER COMMENTED THAT AT THE LAST MEETING, <br />THE BOARD DID AUTHORIZE THE POSSIBILITY OF NEGOTIATING THE CONTRACT <br />RATHER THAN REBIDDING FOR THIS PROJECT BECAUSE WE HAVE A DEADLINE TO <br />MEET, AND THEY ARE STILL WORKING IN THAT DIRECTION. HE CONTINUED <br />THAT SOME SUPPLEMENTARY WORK WAS DONE FOR CONSIDERATION AS TO THE <br />POSSIBILITY OF LOOKING INTO COSTS FOR SEWER SERVICE TO GEOFFREY'S <br />SUBDIVISION AND THE MIDDLE 6 AND 7 SCHOOLS. <br />COMMISSIONER LYONS NOTED THAT COMMUNITY DEVELOPMENT DIRECTOR <br />REGAN WOULD HAVE LIKED TO HAVE BEEN ABLE TO HOOK THE GEOFFREY SUBDI- <br />VISION INTO THE CITY OF VERO BEACH SYSTEM, BUT BECAUSE OF PAST <br />HISTORY, HE SUGGESTED THAT THEY LOOK INTO PUTTING IT IN THE GIFFORD <br />SYSTEM. <br />COMMISSIONER WODTKE BROUGHT UP THE POSSIBILITY, IF WE WERE <br />TO BE FUNDED IN THE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM, OF <br />CHECKING INTO WHETHER THAT WOULD BE PERMISSIBLE FUNDING AND WHETHER <br />THE COST OF THE LINE DOWN U.S.1 MIGHT BE A LEGITIMATE COST. HE <br />NOTED THE PROGRAM HAS COSTS SET ASIDE FOR WATER SERVICE, AND WHILE <br />THE GEOFFREY SUBDIVISION HAS WATER SERVICE, THEY DONT HAVE SEWER <br />SERVICE. <br />MR. LINER INFORMED THE.BOARD THAT THE INFORMATION FROM <br />ENGINEER ROBBINS' REPORT WAS GIVEN TO COMMUNITY DEVELOPMENT DIRECTOR <br />REGAN, BUT HE DECIDED THE COST WOULD BE PROHIBITIVE. <br />ENGINEER ROBBINS REPORTED THAT HE DID PREPARE A PRELIMINARY <br />DESIGN TO INSTALL A COLLECTION SYSTEM, PUMPING STATION, ETC., AS <br />CALLED FOR IN THE 201 PROGRAM, IN GEOFFREY SUBDIVISION; THERE ARE ABOUT <br />177 HOMES IN THAT AREA, AND THE FIGURE WAS IN EXCESS OF $550,000. <br />THE MAJORITY OF THE COST INVOLVED WAS IN THE FORCE MAIN ITSELF, WHICH <br />WAS ABOUT 11,000' LONG. <br />OCT 2 2 1980 <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.