Laserfiche WebLink
OCT 2 21980 Boos 45 PAcF- _ 70 <br />ATTORNEY COLLINS INFORMED THE BOARD THAT THERE ARE SOME <br />CONFLICTS BETWEEN THE SOUTH BEACH WASTEWATER AGREEMENT AND THE UNDER- <br />LYING 1973 AGREEMENT. HE STATED THAT HE HAS ALWAYS TAKEN THE <br />POSITION THAT THE CITY HAD ULTIMATE RESPONSIBILITY FOR SEWER SERVICE <br />ON THE SOUTH BEACH, AND BY THIS NEW AGREEMENT, WE ARE LIMITING THAT <br />RESPONSIBILITY TO 600,000 GPD. THE REASON FOR THAT IS THAT THE <br />PHILOSOPHY OF THE CITY NOT EXPANDING THEIR TREATMENT FACILITY ABOVE <br />A CERTAIN LEVEL HAS BEEN ACCEPTED, AND THE 600,000 GPD ALLOCATED <br />IN THE MID FLORIDA AREA WILL BE SWUNG OVER TO THE BEACH. ANOTHER <br />REASON FOR ACCEPTING THIS IS THAT THE'SOUTH BEACH IS TO BE DEVELOPED <br />ON A SINGLE FAMILY BASIS PRIMARILY, WITH THE EXCEPTIONS OF THE <br />MOORINGS. IT IS NOT ANTICIPATED THAT THE MOORINGS WILL HAVE A RE- <br />QUIREMENT OVER 600,000 GPD, AND IF THEY D0, IT IS UP TO THEM TO <br />RESOLVE THAT, AS TO THE CROSS REFERENCES BETWEEN THE VARIOUS AGREE- <br />MENTS, ATTORNEY COLLINS CONFIRMED THAT THESE HAVE BEEN CHECKED CAREFULLY <br />COMMISSIONER LYONS COMMENTED THAT ATTORNEY COLLINS HAS <br />UNDERTAKEN A GARGANTUAN TASK AND DONE A TREMENDOUS JOB OF UNTANGLING <br />THIS MAZE OF AGREEMENTS. <br />CHAIRMAN SIEBERT ASKED IF THE SOUTH BEACH WATER LIMITATION <br />IS THE DESIGNED CAPACITY OF THE LINE THAT IS TO BE CONSTRUCTED, AND <br />ATTORNEY COLLINS STATED THAT IT IS AND EXPLAINED THAT MR. ROBBINS <br />WILL DESIGN A LINE THAT ANTICIPATES MEETING THE ENTIRE SOUTH REACH <br />REQUIREMENTS ON A SINGLE FAMILY BASIS. <br />CHAIRMAN SIEBERT QUESTIONED WHETHER THE CAPACITY LIMITATION <br />IS THE CAPACITY OF THE LINE OR THE CITY`S CAPACITY TO SERVE, NOTING <br />THAT PARAGRAPH % OF THE SOUTH BEACH WATER AGREEMENT CALLS FOR A <br />MORATORIUM ON CONNECTIONS IF THE CITY DECIDES THEY CANNOT PROVIDE <br />FURTHER WATER DUE TO CAPACITY LIMITATIONS. HE WISHED TO KNOW IF THIS <br />COULD RELATE TO THEIR CAPACITY TO PROVIDE FROM THEIR WELLFIELDS. <br />ATTORNEY COLLINS EXPLAINED THAT PARAGRAPH 3 STATES THAT <br />THE CITY ACCEPTS THIS AREA UP TO THE CAPACITY LIMITS OF THE WATER <br />TRANSMISSION LINE TO BE INSTALLED BY THE COUNTY. HE CONTINUED THAT <br />THERE ORIGINALLY WERE REFERENCES IN THE PRIOR DRAFTS TO CAPACITY <br />LIMITATIONS BACK TO THE WELLFIELDS, BUT ALL THOSE REFERENCES ARE <br />DELETED FROM THIS CONTRACT. <br />