My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/5/1980 (2)
CBCC
>
Meetings
>
1980's
>
1980
>
11/5/1980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:55 AM
Creation date
6/11/2015 12:41:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Fire Commissioners
Document Type
Minutes
Meeting Date
11/05/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE BOARD OF COUNTY COMMISSIONERS THEREUPON RECONVENED <br />AT 1:50 O'CLOCK P.M. COMMISSIONER DEESON WAS ABSENT FOR THE AFTER– <br />NOON SESSION DUE TO AN OUT–OF–TOWN BUSINESS MEETING. COMMISSIONER <br />WODTKE WAS TEMPORARILY ABSENT TO ASSIST WITH THE COUNTING OF THE <br />ABSENTEE BALLOTS. ALL OTHER COMMISSIONERS WERE PRESENT. DEPUTY <br />CLERK VIRGINIA HARGREAVES TOOK OVER FROM DEPUTY CLERK JANICE <br />CALDWELL FOR THE REMAINDER OF THE MEETING. <br />UPDATED REPORT ON STATUS OF SOUTH COUNTY WATER SYSTEM <br />UTILITY DIRECTOR GEORGE LINER CAME BEFORE THE BOARD AND <br />REVIEWED THE FOLLOWING MEMORANDUM FROM ENGINEER JOHN ROBBINS: <br />S'VI;I,DHUP & PARCEL AND ASS�uATES, INC. <br />AND <br />BI INL>ORF AND ASSOCIA1I-S, INC, <br />I �,ItIIN) VtN11,10) <br />hiijvct No. <br />MEMORANDIIM <br />11I: ;ottr•�Ie Liner, llt.ilitie,- Dept. <br />Indi,ur River Courty <br />i i,NM: Joon A. Robbin,, <br />t;f : St.Itus Report of Projects by Sverdrup & Parcel and A-)-, rciates, Inc. <br />and lieindort and Associates, Inc. (A Joint Venture) <br />!I --I - )0UfH Ct�UNI) IAY UIS1lt1C1 Lnyineur's Pro,j. No. 085iS <br />6674 <br />status of the :South County Water System is as follows: <br />,,,t I <br />?l'rnitar,hrs h��rn cony�leted and set-up to provide data at completion <br />Of praduction wells. <br />". f M1 <br />f i�ldtis heinq j;erformod by Geraghty and Miller. <br />--Production 'Fell No. 1 was- begun on Monday, November 3, 1980. Cfillip le- <br />t i on to he ,rrc olilpl i"hod opprox ima toly i n three to four weeks. Thi s <br />wi11 delay issu,rnce of the Process equipment Specification by the same <br />amount of tient'. <br />- Tho Transmjssion Distribution tiystem i, in final design. Advertisement <br />for bid is scheduled for approximately the middle of December. Initial <br />review of rjc)ht.-of-way indicates we will have a problem on Oslo Road, <br />oast, of the tre,rtment plant site to ll.S. 1. Also," we have a problem on <br />Old Dixie fiidhviay. A review and field check of right-of-way problems is <br />scheduled for the week of November lO, 1980.NOV 51980 5 l�Al;E <br />71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.