Laserfiche WebLink
Nov 5 1980 BOOK 45 PAGE 190 <br />--The Process Specification is nearing completion. The water duality <br />information will be the last remaining item for inclusion. Again, <br />the test well program is delaying this. <br />IILM =2 - GIFFORQ AREA SEWERAGE IMPROVEMENTS Engineer's Proj. No. 5675-G <br />Status of Gifford Area Sewerago Improvements is as follows: <br />--Plans and Specifications with revised permit applications were <br />submitted October i1, 1980, to D.E.R. on schedule. <br />--Ile currently have a proposal in to FmIIA requesting to sign a <br />Contract with Driveways, inc., based on the original bidding <br />process. Changes to the scope of work are proposed to be <br />accomplished by Change Order at execution of the Contract. <br />We are awaiting a decision by FmHA, vrhich should occur this <br />week. <br />11 k M '..-- PEBBLE 13AY AREA SFWERAGC IMPROVEMENTS Engineer's Proj. No. 6765 <br />Status of Pebble Bay Area Sewerage in is as follows: <br />--We are currently working with the Utilities Department and the <br />City of Vero Beach to determine the point of connection to the <br />City's system which will govern the ultimate design criteria for <br />this Vera Cruz Pump Station. We will complete plans, specifications <br />and revise permit applications as soon as details for ultimate <br />connection have been resolved with the City and Town. <br />11E�l t4 - 201 FACILITIES PLAN <br />Engineer's Proj. No. 6383-C <br />--The proposed monitor plan via-, submitted to D.E.R. in Orlando and <br />review comments have been received. Review comments to the <br />monitoring plan indicate additional requirements and a more <br />lengthy plan than originally discussed. After meeting with <br />Pat Lyons and Joe Collins, a meeting with State Representative <br />Dale Padgett was arranged. Brian Barnett was also present <br />representing Florida Game and Freshwater Fish Commission. <br />Mr. Padgett contacted Jake Varn, Secretary of Florida D.E.P.., <br />and a meeting with D.E.R. staff and County delegates has been <br />arranged in Tallahassee on November 12, 1980. A report on that <br />meeting will be presented to the Commission at a later date. <br />ITEM �5_-THE LEGAL AGREEMENT REVIEW FOR UTILITIES DEPT. Engineer's Proj. No. 6383-A <br />--Reviews onall legal agreements pending have been completed, with <br />exception to the City -County -Town Agreement. The remaining item <br />to he reviewed is Exhibit B of said Agreement. We will continue <br />our review of Exhibit 13 when it is submitted to the County. <br />ITEM_ r6 - SOUTH REACH WATER LINE EXTE_N_SI_ON Engineer's Proj. No. 6383-A <br />PRELIMINARY COST ESTIMATES <br />--tde are currently working with the Utilities Department and the City <br />of Vero Beach to collect preliminary data for preparation of <br />preliminary cost estimates. The City of Vero Beach is currently <br />having a Hardy -Cross Analysis on their disbtibution system and said <br />analysis has not been submitted to the County as yet. We will begin <br />actual hydraulic analysis of the proposed South Beach Water Line <br />when the City's information is available. In the meantime, we are <br />collecting pertinent data which will aid in the final design of <br />this project. A special team has been scheduled to begin immediate <br />work on this project. <br />John A. Robhins <br />` , <br />