My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/5/1980 (2)
CBCC
>
Meetings
>
1980's
>
1980
>
11/5/1980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:55 AM
Creation date
6/11/2015 12:41:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Fire Commissioners
Document Type
Minutes
Meeting Date
11/05/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 51900 Boo 45 nGE194 <br />COMMISSIONER LYONS FELT THAT THIS IS AN ORDINARY PIECE OF <br />BUSINESS THAT WE SHOULD TAKE CARE OF ON AN ON-GOING BASIS. <br />ATTORNEY COLLINS QUESTIONED WHAT WAS MEANT BY "RETRO -ACTIVE." <br />ENGINEER ROBBINS EXPLAINED THAT THEY SUBMITTED THE REQUEST <br />BACK ON OCTOBER LOTH, WHICH WAS THE PERIOD OF TIME THEY BEGAN THE <br />REDESIGN OF THE TREATMENT FACILITIES. NORMALLY, DESIGN WORK TO THE <br />EXTENT THEY HAD TO PERFORM TO RELOCATE THE PLANT, THEY DO NOT INVOICE <br />UNDER "ADDITIONAL SERVICES." HE INFORMED THE BOARD THAT THEY PUT <br />A FAIRLY GOOD SIZE TEAM ON THE PROJECT AND COMPLETED THE PLANS AND <br />SPECIFICATIONS IN 2-1/2 WEEKS, HE NOTED THAT IN THAT PERIOD WHEN <br />THEY COMPLETED THIS WORK, HE STILL HAD NOT APPROACHED THE BOARD WITH <br />THE CONTRACT MODIFICATION REQUEST; S0, AS A RESULT, THE WORK HAS <br />BEEN COMPLETED, AND THE REASON FOR THE MODIFICATION WAS TO COVER THE <br />COST DURING REDESIGN. HE, THEREFORE, ASKED THAT THE CONTRACT MODIFI- <br />CATION BE RETROACTIVE TO INCLUDE THE ADDITIONAL SERVICES FOR REDESIGN. <br />ATTORNEY COLLINS DID NOT BELIEVE THE BOARD HAS THE POWER <br />TO PAY THIS RETROACTIVELY, BUT FELT THEY DO HAVE THE POWER TO PAY THE <br />ENGINEERS FOR ADDITIONAL SERVICES. <br />COMMISSIONER LYONS NOTED THAT THE BOARD WANTS TO DO WHATEVER <br />IS RIGHT TO COMPENSATE THE ENGINEERS BECAUSE THEY WENT AHEAD IN GOOD <br />FAITH AND AT FULL SPEED, AND HE FELT WHATEVER WAY IT HAS TO BE DONE, <br />IT SHOULD BE DONE SO THEY ARE TREATED FAIRLY, COMMISSIONER LOY AGREED <br />THAT EVERYONE HAS ACTED IN GOOD FAITH,.AND WE HAVE ENCOURAGED THE <br />ENGINEERS TO MOVE ON. <br />CHAIRMAN SIEBERT ASKED THE ATTORNEY HOW WE CAN ACCOMPLISH <br />THIS, <br />ATTORNEY COLLINS STATED THAT THE BOARD COULD APPROVE THE <br />MODIFICATION AS SUBMITTED AND THEN AUTHORIZE THE ENGINEER TO SUBMIT <br />AN ADDITIONAL BILL FOR EXTRAORDINARY SERVICES. <br />MR. ROBBINS NOTED THAT ACTUALLY THEY HAVEN'T SUBMITTED A <br />BILL FOR EITHER THE ORIGINAL DESIGN OR THE REDESIGN, AND THEY HAVE <br />BEEN CARRYING THIS ON THEIR BOOKS FOR ALMOST TWO YEARS. <br />76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.