Laserfiche WebLink
CHAIRMAN SIEBERT NOTED THAT ITEMS #3 AND #4 RE PEBBLE PAY <br />SEWERAGE IMPROVEMENTS AND THE 201 FACILITIES PLAN WERE COVERED THIS <br />MORNING. <br />UTILITY DIRECTOR LINER NEXT REVIEWED ITEM #6 IN REGARD <br />TO THE SOUTH BEACH WATER LINE EXTENSION PRELIMINARY COST ESTIMATES <br />AND NOTED THAT THERE IS NOT MUCH THEY CAN DO UNTIL THE HARDY—CROSS <br />ANALYSIS IS RECEIVED EXCEPT TO CONTINUE TO COLLECT THE PERTINENT <br />DATA TO AID IN THE FINAL DESIGN OF THE PROJECT. <br />MR. ROBBINS REPORTED THAT HE HAS COLLECTED PRELIMINARY <br />AERIALS AND WILL TRY TO.GET AS—BUILT DRAWINGS AND HAVE ALL OUR <br />PRELIMINARY DATA READY BY THE TIME THE CITY GETS THE INFORMATION <br />TO US. <br />CONTRACT MODIFICATION TO AGREEMENT FOR ENGINEERING SERVICES WITH <br />SVERDRUP & PARCEL AND ASSOCIATES, INC., AND BEINDORF AND ASSOCIATES, <br />INC. A JOINT VENTURE <br />CHAIRMAN SIEBERT COMMENTED THAT THE PROPOSED MODIFICATION <br />TO THE AGREEMENT WITH THE JOINT VENTURE IS TO COVER THE GIFFORD SEWER <br />TREATMENT PLANT, AND THIS ONE CONTRACT IS NOT IN LINE WITH THE REST <br />OF THE CONTRACTS WE HAVE HAD WITH THEM. THE MULTIPLIER IS LOWER <br />THAN THEY ARE WORKING ON PRESENTLY. CHAIRMAN SIEBERT STATED THAT HE <br />WAS A BIT SKEPTICAL OF APPROVING THIS AGREEMENT AT THE LAST MEETING <br />OF THE PRESENTLY CONSTITUTED BOARD SINCE THIS WAS NOT AN ACENDAED <br />ITEM, BUT HE HAD NO OBJECTION TO REVIEWING IT AND RECOMMENDING ITS <br />APPROVAL TO THE NEW BOARD, <br />MR. ROBBINS NOTED THAT THERE IS NO MULTIPLIER UNDER THIS <br />CONTRACT; IT IS THE ONLY AGREEMENT FOR ADDITIONAL SERVICES THEY HAD <br />SET UP TO PERFORM ON AN HOURLY RATE BASIS. THIS WAS ESTABLISHED <br />TWO YEARS AGO, AND AS A RESULT, THEY ARE REQUESTING IT BE CHANGED <br />TO A MULTIPLIER WHICH IS CONSISTENT WITH THE REST OF THEIR CONTRACTS, <br />CHAIRMAN SIEBERT STATED THAT HE HAD SAID HE WOULD BE WILLING <br />TO RECOMMEND IT BEING RETROACTIVE. <br />75 <br />NOV 51980 �bOK 45 PAGE 1uj <br />