My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-112 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:31:05 PM
Creation date
10/5/2015 8:57:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/04/2010
Control Number
2010-112
Agenda Item Number
12.J.2
Entity Name
Geosyntec Consultants
Subject
Solid Wate Disposal District
Work Order No. 26
Ground Water Assessment North County R.O. Plant
Supplemental fields
SmeadsoftID
8348
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Terry Southard <br />24 March 2010 <br />Page 3 <br />current concentration of 213 milligrams per liter (mg/L) in the groundwater samples from MW06 <br />then additional assessment and/or reporting may be required to evaluate the extent of horizontal <br />contamination in groundwater near MW06. If we find during completion of this task that <br />additional sampling and/or reporting work is necessary, we will discuss our recommendations <br />with you and seek approval prior to proceeding. <br />For each of the proposed quarterly NAM monitoring events, Geosyntec's findings obtained <br />through the evaluation of the sampling documentation provided by IRC will be presented in a <br />report for submission to FDEP. Please note that Geosyntec has included budget in this task for <br />the review and evaluation of data package by IRC's subcontractor of the field activities and the <br />laboratory results of the groundwater sampling effort. This report will provide details of the <br />work performed by IRC's sampling subcontractor including sample locations, sampling <br />methodology, analytical results and groundwater elevations. A draft report will be provided to <br />you for review and comment before the final version is submitted to FDEP. Geosyntec will <br />submit one hard copy and one electronic copy of each final quarterly groundwater NAM report <br />to the FDEP and one hard copy and a PDF on CD will be provided to you. <br />ASSUMPTIONS <br />In addition to the above, the following assumptions were made in developing this scope and cost <br />estimate: <br />• As IRC requested be done, IRC will address all related issues regarding the following <br />text contained in FDEP's letter dated 21 December 2009 and provide Geosyntec the <br />related documentation: The Manager of the Indian River County Department that resides <br />on the property to the west and north of the Indian River County North RO facility must <br />be notified in writing that the sodium plume has been partially defined and may extend <br />onto the property west of the site and that groundwater monitoring with specific <br />conditions has been approved instead of further assessment at this time. In addition, the <br />Indian River County Board must be notified in writing that the sodium plume may extend <br />onto an adjacent Indian River County property and that monitoring with specific <br />conditions rather than further assessment has been granted at this time. A copy of this <br />letter shall be provided to both parties. Please provide copies of your letters to the <br />Department. If either party requests that the plume be defined further, then the <br />Department will require the extent of the sodium plume to be defined completely. <br />• IRC will notify FDEP of the date of each of the proposed four (4) quarterly sampling <br />events at least 3 days in advance of sampling. <br />XR10051/XR1005I IRC North RO NAM Reporting Proposal.Doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.