Laserfiche WebLink
Mr. Terry Southard <br />24 March 2010 <br />Page 4 <br />• In advance of purging/sampling of any wells during a sampling event, IRC will have their <br />subcontractor conduct the required depth to groundwater measurements from the <br />monitoring wells required by the FDEP-approved NAM plan. Water -level measurements <br />will be used by Geosyntec in conjunction with the existing surveyed well elevations for <br />continued evaluation of groundwater flow directions. <br />• issues identified by Geosyntec associated with the data package provided by IRC of the <br />field activities and the laboratory results of the groundwater sampling effort will be <br />addressed by IRC at no cost or effort to Geosyntec. <br />• Budget has not been included for any additional delineation sampling or monitoring well <br />installations in the vicinity of monitoring well MW06. <br />ESTIMATED BUDGET <br />A summary of estimated project costs is included in Attachment B. <br />XR10051/XRI0051 IRC North RO NAM Reporting Proposal.Doc <br />engineers I scientists I innovators <br />