My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/1980
CBCC
>
Meetings
>
1980's
>
1980
>
12/5/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:56 AM
Creation date
6/11/2015 12:46:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
12/05/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 51980 9001( 45 PACE 411 <br />INDIAN RIVER COUNTY <br />COUNTY COURTHOUSE <br />CO #5 <br />I tom 1 Include the cost of. Item tin. 1 - CO 93, $ 250.00 <br />which was not included in the sum total <br />of CO #3. <br />Item 2 Wrap the existing air conditioning duct 1,925.00 <br />on the north portion of thr courthouse <br />roof with DIM aluminum m-mhr:-jne. This is <br />a first line cost item. <br />Item 3 Provide hardware for existing doors -at 16,985.94 <br />the Courthouse. This is a first line <br />cast item, the cost of which could not <br />he determined at th#,� t:imr� of bid,jing. <br />Item 4 CP -5 Supplement - Dry wa1.1 was excluded from 1,180.35 <br />CP -5 until requirements COUld be determined. <br />Item 5 CP -13 - Additional work r.�yuired to provide 13,694.75 <br />suitable interior finishes to areas as <br />noted in this Change Proposal. <br />Item 6 CP -17 - Lower ceiling in Room 109 and provide 1,117.60 <br />duct and ceiling diffusers. <br />Item 7 CP -19 - Provide exhaust fan and duct in.first 1•,151.25 <br />floor women'.; toilet at owner's request. <br />Item 8 CP -20 - Modify jury box at owner's request. 1.,789.10 <br />Item 9 CP -23 - Provide hardware for aluminum doors 3,073.33 <br />per specifications and not in hardware <br />Schep+ule. <br />`POTAI. <br />$41,168.32 <br />MR. KONTOULAS REPORTED THAT HE HAS CHECKED ITEM I AND <br />VERIFIED THAT IT WAS NOT INCLUDED IN CHANGE ORDER #3. <br />ITEM 2 - MR, KONTOULAS EXPLAINED THAT THE SPECIFIED ROOFING <br />COULD NOT BE USED BECAUSE OF THE WATER UNDERNEATH THE ROOFING ON THE <br />NORTH END OF THE COURTHOUSE, AND THE DIFFERENCE FOR THE ROOFING WAS <br />INADVERTENTLY LEFT OFF THE CHANGE ORDER BY THE ARCHITECT. THE ACCUMU- <br />LATION OF WATER IS BEING CAUSED BY THE OLD INSULATION WRAPPED AROUND <br />THE EXISTING DUCT, AND MR. KONTOULAS FELT IT IS WORTH $1,925 TO CURE <br />THIS SITUATION, <br />MR. KONTOULAS CONTINUED THAT THE HARDWARE FOR THE EXISTING <br />DOORS AS CALLED FOR IN ITEM 3 IS A NECESSITY. <br />[:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.