My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/1980
CBCC
>
Meetings
>
1980's
>
1980
>
12/5/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:56 AM
Creation date
6/11/2015 12:46:23 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ e <br />RIVER COUNTY COMMISSION <br />-�-HANGE <br />�.. ., <br />APCHII [J <br />AR�H11I(T (,] <br />ORDER <br />CONTRA( TOT: ( ] <br />- -- -- <br />HIL D U <br />111 DOCUWti'T C.701 <br />011UR <br />i,RoIECT: Indian River County <br />,name address) County Courthoure <br />TO (C ontractorl <br />Reinhold Construct ion <br />P,O.Box 666 <br />Coco.), Florida 32922 <br />CHANC;I ORDER NUMBER <br />BOOK 45 Pat 413 <br />5 ( five ) <br />ARCI I l E C T'S PR()IECT N0:1664 <br />CON1 KACT EOR Addition`, and <br />Renovation,, <br />Co NIKACT DATE: 1+-2-80 <br />You a,,e directed to make the folio%%ing changes in this Contract: <br />SEE ATTACHED SHEET <br />The proposed changes in the work may result in additional time required <br />boyond the contract completion date. Additional time will be added <br />to the contract that is directly related to this change order. The <br />contractor will be paid for the additional -required days at the rate of <br />$300.00 (three hundred) per day for fired overhead costs. The number of <br />days requested are reflected in CP -13, CP -17 and CP 20. <br />Thr original Contract Sum ssas . . . . . . S <br />NO Change by previous Change Orders S <br />The Contract Sum Prior to this Change Order was S <br />T) ,• Contract Sum will be (in(reased) (decreased) (unchangvdi by this Change Order . S <br />The nes+ Contract Sum including this Change Order will be . • . • • • • S <br />The Contract Time will be (increased) (decreased) (un(hanged) by <br />Tt, . I)ate of Completion as of the date of this Change Order therefore Is <br />CONNELL METCALF ri EDDY___ _ RE MHOLD 1011 -INC_ <br />ARIMIICT C0',TRACT0t, <br />c(-,uth_Dixie� Hight,,,ry_ -CONSTRUCT -- _ <br />At(,rstl Gabit�,, Florida 3134 Cocoa <br />(.., Florida 32922 <br />By <br />t i .:, <br />Ark 0C1CL`A1%T G761 - (f/N'.(,l Os L)IR • APR(t 14'0 WITION, • Al,,* ' + 10-0 - 111E <br />oiPii Ak% INSTrTGTE OF ARCHITECTS, 1735 ~Esti' YORK AbE , N%%, DC 2000 <br />689,000.00 <br />23,66;.90 <br />712,665.90 <br />41,168.32 <br />73,8311.22 <br />{ <br />) Days. <br />INDIAt-I <br />RIVER COUNTY COMMISSION <br />qq '�tiER <br />2 1''5 <br />14th Avenue --- __-_ <br />Address <br />Vero Be Florida 32960_ <br />PY <br />- -- -- <br />y—�i— <br />o%E PAGE <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.