My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/31/1980
CBCC
>
Meetings
>
1980's
>
1980
>
12/31/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:56 AM
Creation date
6/11/2015 12:48:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/31/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 311980 <br />45 P�6� 5,3 <br />MR. ROBBINS STATED THAT HE DOES NOT AS YET HAVE THE BID IN <br />HAND FROM DRIVEWAYS, INC. AND CANNOT PRESENT A BID SUMMARY, BUT HE <br />WOULD LIKE TO PRESENT THAT AT THE NEXT MEETING AND MAKE A FORMAL <br />RECOMMENDATION. HE NOTED THAT THE RESULT OF THE ACTION TO HAVE -THE <br />POND CONSTRUCTION TECHNIQUE ALTERED HAS PUT THE PROJECT BACK WHERE <br />WE CAN BUILD IT UNDER THE PROJECT FUNDS AND WITHIN OUR ESTIMATED <br />BUDGET. HE CONTINUED TO REVIEW THE FIGURES PRESENTED IN THE PROJECT <br />COST SUMMARY AND EXPLAINED THAT SECTION VI - ADDITIONAL WORK REQUIRED <br />RELATES TO THE PINE VIEW PARK WATER LINE RENOVATION, ON WHICH IT WAS <br />RECOMMENDED THAT THE WORK BE DEFERRED UNTIL THE SEWAGE PLANT WAS IN <br />SO THAT WE COULD EFFECT A $20,000 SAVINGS. <br />COMMISSIONER SCURLOCK QUESTIONED THE FIGURE FOR LEGAL FEES <br />LISTED IN SECTION III, AND ATTORNEY COLLINS FELT THE FIGURE REPRESENTS <br />LITIGATION WITH RAYMOND .JACKSON OVER THE PROPOSED SITE ON KINGS HIGHWAY <br />AND THAT IT MIGHT ALSO INCLUDE BOND ATTORNEY'S FEES. HE STATED THAT <br />HE WOULD SUPPLY A BREAKDOWN. <br />COMMISSIONER FLETCHER QUESTIONED THE $19,255 INCLUDED UNDER <br />SEC. III - LEGAL ADMINISTRATIVE AND INTEREST FOR EQUIPMENT PURCHASE. <br />MR. ROBBINS EXPLAINED THAT THIS REPRESENTED SOME EQUIPMENT <br />NEEDED BY THE UTILITIES DEPARTMENT TO OPERATE THE SYSTEM IN THE - <br />INTERIM; -THE TRANSACTION DID GO THROUGH THE COUNTY COMMISSION AND <br />DID HAVE FHA APPROVAL SO IT WAS TAKEN OUT OF THE CONTINGENCY FUNDS <br />AVAILABLE. HE AGREED THAT THIS ITEM MAY HAVE BEEN INCLUDED IN THE <br />WRONG LOCATION. <br />201 PLAN <br />ENGINEER ROBBINS ADVISED THE COMMISSION THAT THE VERO REACH <br />CITY COUNCIL DID ADOPT A RESOLUTION APPROVING THE 201 PLAN, AND THAT <br />HE WILL FORWARD THIS TO THE EPA VERY QUICKLY. <br />UPDATE 0N SOUTH COUNTY WATER PROJECT <br />UTULITIES DIRECTOR GEORGE LINER STATED THAT THE UPDATE ON <br />THE SOUTH COUNTY WATER PROJECT IS VERY WELL COVERED IN THE FOLLOWING <br />MEMO FROM ENGINEER .JOHN ROBBINS: <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.