My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/31/1980
CBCC
>
Meetings
>
1980's
>
1980
>
12/31/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:56 AM
Creation date
6/11/2015 12:48:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/31/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ SVERDRUP & PARCEL_SSOCIATES, INC. <br />AND <br />December 26, 1980 <br />BEINDORF AND ASSOCIATES, INC. <br />(A JOINT VENTURE) <br />MEMORANDUM <br />Project No. <br />TO: George Liner, Utilities Dept. <br />Indian River County <br />FROM: John A. Robbin al -C <br />SUBJECT: Status Report of Projects by Sverdrup & Parcel and Associates, Inc. <br />and Beindorf and Associates, Inc. (A Joint Venture) <br />ITEM #1 - SOUTH COUNTY TAX DISTRICT Engineer's Proj. No. 685S <br />6674 <br />Status of the South County Water System is as follows: <br />--Both production wells have been constructed as well as the monitoring <br />well, and pump tests on each of the wells is nearing completion. <br />During the pump test, water level elevations in the wells adjacent to <br />the property owned by Oslo Road Nursery were also observed. The actual <br />effects on the adjacent wells will be determined by Geraghty & Miller. <br />Water quality samples have been taken from both of the new wells and <br />results should be available within two weeks. <br />--We have received a preliminary copy of the construction drawings for the <br />transmission system and hope to review this set of preliminary drawings <br />with the County within the next week. Due to the requirements placed <br />on this project by Farmers Home Administration (FmHA), the bid date for <br />the transmission system will be postponed until bids are to be received <br />for the R/0 equipment and support facilities. The process specification <br />is being modified slightly to accommodate bidding it concurrently with <br />the support facilities. We have begun preliminary design of the treat- <br />ment plant building (support facilities) and will be proceeding expedi- <br />tiously to complete final design of the support facilities as quickly <br />as possible. Tentative date for completing process specification and <br />support facilities is now targeted for mid April, 1981. <br />ITEM #2 - GIFFORD AREA SEWERAGE IMPROVEMENTS Engineer's Proj. No. 5675-G <br />Status of Gifford Area Sewerage Improvements is as follows: <br />--Refer to letter to Mr. Neil Nelson, Dated December 23, 1980. <br />ITEM #3 - PEBBLE BAY AREA SEWERAGE IMPROVEMENTS <br />Engineer's Proj. No. 6765 <br />Status of Pebble Bay Area Sewerage Improvements is as follows: <br />--We have conducted a preliminary review of the system design to connect <br />the Pebble Bay Area and the Town of Indian River Shores to the City of <br />Vero Beach's wastewater system. The meeting was with Mr. Hillman Goff <br />of the City's Water and Sewer Department. Another meeting to discuss <br />final conceptual design will be scheduled as quickly as possible. <br />In addition, we have signed a Contract with the Town of Indian River <br />Shores to provide engineering services for the design of the Town's <br />portion of the system. We are now in the position to begin final design <br />3 <br />31 80 23 aacn� �5� �acF 540��� <br />DEC 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.