My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/14/1981
CBCC
>
Meetings
>
1980's
>
1981
>
1/14/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:49:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/14/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. A copy of Change Order No. 1 which will adopt the revised <br />Construction Drawings, revised Technical Specifications <br />and revised Bid Schedule. Please note, the original bid <br />received by Driveways, Inc., on September 5, 1979, was <br />$265,345.25. Change Order No. 1 will increase the original <br />contract amount by $103,390.85. <br />4. A copy of the Bid Tabulation for the original bids received <br />on September 5, 1979. <br />We have examined Driveways' revised bid. Their bid is approximately 7°0 <br />higher than our Engineer's Estimate and we feel this is not excessive and, <br />therefore, find Driveways' bid acceptable. It should be noted, Driveways' <br />original bid bond for bids received September 5, 1979, is still in effect <br />and we consider Driveways, Inc. to be capable of performing the work as <br />described by the revised contract documents, technical plans and specifica- <br />tions. <br />Our recommendations for implementing this project are as follows: <br />A. Issue the Notice of Award of the Contract for Phase II <br />Gifford Area Sewage System Improvements to Driveways, Inc. <br />based on the bids received September 5, 1979. <br />B. Authorize the Chairman of the Board to execute the Contract <br />Documents subject to the review and approval of the documents <br />by the County Attorney. <br />C. Authorize the Chairman of the Board to execute Change -Order <br />No. 1 at the safie time the Contract Documents are executed. <br />D. Authorize the.Chairman of the Board to issue the Notice to <br />Proceed to the Contractor after approval of the Contract <br />Documents by the Farmers Home Administration. <br />Please note, the original Bid Tabulation of September 5, 1979 and the Project <br />Cost Summary of December 31, 1980 are included for your information. <br />We will make a recommendation on the water line renovation for Pine View Park <br />Subdivision after construction of this project is under way. <br />Should you require further information or clarification, please call. <br />Very truly yours, <br />q,Jl.hn A. Robbins <br />For the Joint Venture <br />MR. ROBBINS WENT INTO THE HISTORY OF THE GIFFORD PLANT <br />SITE, EXPLAINING THAT WE HAD TO GO THROUGH ADMINISTRATIVE HEARINGS, <br />HAD TO SEEK A DIFFERENT SITE AND TO GO THROUGH REDESIGN. IN ORDER <br />TO EXPEDITE THIS PROJECT, THEY APPROACHED FMHA FOR PERMISSION TO AWARD <br />THE CONTRACT ON THE BASIS OF THE ORIGINAL BIDS RECEIVED, AND FMHA <br />DID AUTHORIZE AWARDING THE CONTRACT IN THAT MANNER. THE JOINT VENTURE, <br />THEREFORE, IS RECOMMENDING THAT THE CONTRACT ON THE REVISED SPECIFICA— <br />TIONS BE AWARDED TO THE ORIGINAL LOW BIDDER, DRIVEWAYS, INC., WHO HAVE <br />KEPT THEIR BID BOND IN EFFECT. IT IS FELT THAT DRIVEWAYS, INC., 7% <br />INCREASE IS ACCEPTABLE. MR, ROBBINS THEN WENT OVER THE .JOINT VENTURES <br />RECOMMENDATIONS AS SET OUT IN HIS LETTER. <br />59 4 <br />AN 141981 BOOK r . F cE <br />
The URL can be used to link to this page
Your browser does not support the video tag.