My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1981
CBCC
>
Meetings
>
1980's
>
1981
>
1/28/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:51:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/28/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i CHANGE ALK' T <br />-SRC �'�EC T - <br />ORDER <br />FIELD (� <br />AIA DOCUMENT G701 OTFi;R <br />PROJECT: Indian liver County CHANGE ORDER NUMBER. 13 (T�hirteen) <br />(name, address) County Administration Building <br />TO (Contractor) <br />F <br />Reinhold Construction, <br />P.O. Box 666 <br />Cocoa, Florida 32922 <br />_ ARCHITECT'S PROJECT NO: 9263 <br />Inc. CONTRACT FOR: Additions & Renovations <br />CO'-.TP,ACT DATE: r 1 <br />You are directed to make the folloveing charzes in this Contract <br />Item <br />1 <br />— CP <br />35 — <br />Interior <br />Finishes & Hard -are <br />Item <br />2 <br />- CP <br />38 - <br />Install <br />Soffits Over Door X133 <br />& =134 & <br />eccr =132. <br />2,016.93 <br />Itein <br />3 <br />- CP <br />35 - <br />Prc%?ice <br />Dcc-- & 1 game `or i:co - 211.5 <br />? 3 8, 9 , <br />Item <br />4 <br />— CP <br />41.— <br />Laminate <br />Va_,lt & Remove Insulation. <br />472.50 <br />Item 5 — CP 42 — Repair CSG & H2•I Frames— Provide <br />Junction Bo:: <br />(See attached Change Proposa's) <br />CC 6D-2.32 <br />y L': , 993. 3 i <br />The proposed changes in the rrork, may result in additional time required <br />beyond the contract completicn date. Additional time will be added to <br />the contract that is directly related to this change order. The con- <br />tractor will be paid for the additional required days at the rate of <br />$300.00 (three hundred) per day for fixed overhead costs. The number <br />of days requested are reflected in CP -35, 33, 39 41 and 42. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . S —2,748,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . s 176,716.90 <br />The Contract Sum prior to this Change Order xa; . . . . . . . . S -2,924,716.95 <br />The Contract Sum will be (increased) (d ekiXi%itdX4i � by this Change Order . . . S 24,993.37 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . S 2,949,710.30 <br />The Contract Time will be by <br />The Date of Completion as of the date of this Change Order therefore is <br />Connell Metcalf & Eddy__ Reinhold Cons_ truction�I���Indian Ri�e_r Ct1>��t�• <br />Ct1>��t�•5T HITECT OQ RACT61 OWNER <br />20 S. Dixie 13wy. P. _ 0�;2 145__JAth_Atie__ <br />Address Address Address <br />Coral Gables, FL 33.134 Cocoa, FL 32922 +Beach. FL 32960 <br />By, t c s.`BY <br />DATE �t4�.J• jf� DATE �'' 3 �.� DATE��"�� <br />AIA DOCUMENT 0701 - CHANGE O;ZDtR - APRIL 1970 EDITION - AIA$: - 0 1970 - THE ONE PACE <br />AMERICAN InSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />JAN, 2 1981 8 © PxE 705 <br />
The URL can be used to link to this page
Your browser does not support the video tag.