Laserfiche WebLink
Geraghty & Miller, Inc. <br />Indian River County - 2 - 20 Jan 81 <br />Commissioners P225SC2 <br />one-hour intervals and 1846 gpm for 20 minutes. These pumping <br />rates are higher than those anticipated in our March 1979 <br />report to the County. <br />Preliminary analysis of the test data indicates that aquifer <br />parameters are slightly more favorable than those assumed in <br />the predictive model that we discussed in our March 1979 report. <br />As a result, impacts of the proposed withdrawals will be <br />slightly less than those predicted. <br />We have not received results on water -quality analyses as yet. <br />John Robbins of the Joint Venture will be better able to dis- <br />cuss them with the County when they become available. <br />Geraghty & Miller has completed three of the five tasks defined <br />in its January 7, 1980, contract. The status of these tasks is <br />as follows: <br />Task 1:- Preparation of Specifications and Contractor's <br />Proposal Form <br />Under this task, we proposed and budgeted for the preparation <br />of the Technical Specifications to be incorporated into the <br />contract documents for bidding the drilling and testing program. <br />At the request of the Joint Venture, the scope of this task was <br />expanded to include the preparation of the contract documents. <br />At the timQ of the request, a set of FmHA guidelines to be <br />followed in the preparation of the contract documents was for- <br />warded to Geraghty & Miller. On April 15, 1980, a draft copy <br />of the specifications and contract documents was submitted to <br />the Joint Venture. After the Joint Venture reviewed the docu- <br />ments with its FmHA expert, it was discovered that the guide- <br />lines were not the proper ones for a contract of this dollar <br />amount and we were asked to rework the documents. The rework <br />was extensive, as it required changes in both the form and sub- <br />stance of the contract. In addition, Geraghty & Miller, Inc., <br />administered the contract between the County and Alsay-Pippin <br />Corporation during the course of the program.* <br />Geraghty & Miller has completed 100 percent of the work in Task <br />1 at a cost of $13,703.82. This figure represents $8,703.82 <br />over the amount budgeted in our proposal. <br />5 PAVE 70T, <br />JAN 28 1981 <br />