My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1981
CBCC
>
Meetings
>
1980's
>
1981
>
1/28/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:51:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/28/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- <br />JAN 2 8 1981 <br />Geraghty & Miller, Inc <br />BOOK 45 PSE 708 <br />Indian River County - 3 - 20 Jan 81 <br />Commissioners P2258C2 <br />Task 2: Compilation of Well, Permit, and User Inventory <br />The work completed under this task consisted of obtaining in- <br />formation from the St. Johns River Water Management District, <br />South Florida Water Management District, U. S. Geological <br />Survey, Florida Department of Natural Resources, and local <br />drillers. More time than anticipated was needed to obtain the <br />data from St. Johns River Water Management District files. <br />Also, additional time was spent in an attempt to locate any <br />nearby well that could be used as an observation well during <br />the program per the County Commissioners' request. <br />Geraghty & Miller has completed 100 percent of the work under <br />Task 2 at a cost of $4,556.73. This figure represents $856.73 <br />over the amount budgeted in our proposal. <br />Task 3: Drilling of Two Production Wells and Associated <br />Testing <br />The work completed under this task consisted of on-site inspec- <br />tion of the well construction and data collection during drilling <br />and testing. As of December 31, 1980, the task was 100 percent <br />completed. Total costs of this work have been $28,605.45, which <br />is $105.45 over the amount budgeted in our proposal. During <br />the 16 -day overrun of the drilling contractor, Geraghty & Miller <br />incurred approximately $9,000 in charges related to Task 3. Most <br />of these charges were for services anticipated in Task 3 and <br />would have been incurred even if the drilling contractor had_ <br />completed his work by the specified completion date. However, <br />some additional field -inspection duties were necessary. If <br />this overrun had not occurred, Geraghty & Miller would have <br />been under budget on this task by approximately $3,000. <br />Task 4: Reduction of Data and Preparation of Reports <br />As of December 31, 1980, no costs had been incurred under this <br />task. Preliminary technical data analyses performed in preparing <br />this status report have not yet been charged. <br />Task 5: Project Meeting, Conferences, and Related Work <br />As of December 31, 1980, no costs have been incurred under this <br />task. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.