My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/11/1981
CBCC
>
Meetings
>
1980's
>
1981
>
2/11/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:52:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/11/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,JOINT VENTURE - STATUS REPORT OF PROJECTS - AUTHORIZATION REQUESTS <br />THE BOARD NEXT DISCUSSED THE MEMORANDUM PREPARED BY .JOHN <br />ROBBINS, AS FOLLOWS: <br />February 5, 1981 <br />TO: <br />FROM: <br />SUBJECT: <br />SVERDRUP & PARCEL AND ASSOCIATES, INC. <br />AND <br />BEINDORF AND ASSOCIATES, INC. <br />(A JOINT VENTURE) <br />Project No. <br />MEMORANDUM <br />George Liner, Utilities Dept. <br />Indian River County <br />John A. Robbin42 <br />Status Report of Projects by Sverdrup & Parcel and Associates, Inc. <br />and Beindorf and Associates, Inc. (A Joint Venture) <br />ITEM #1 - SOUTH COUNTY TAX DISTRICT Engineer's Proj. No. 6858 <br />6674 <br />Status of the South County Water System is as follovis: <br />--The test well program has been completed and Geraghty & Miller is in <br />the process of analyzing data obtained. They will be preparing <br />supplements for the water use permit. We have received water quality <br />data'and are currently analyzing the data. <br />--The transmission system design has been completed and a set of construc- <br />tion drawings will be submitted to the Utilities Department for review. <br />We will incorporate the County's review comments into the design. <br />- --The support facilities are in the final design stages. We are currently <br />working on the site plan, and will be submitting the site plan to the <br />Planning Department under the site plan review process. In addition, <br />we have been contacted by the South County Fire District to assist them <br />in obtaining site plan information fo.r the proposed Oslo Road Fire Station. <br />--We are targeting -10 advertise for bid in April. <br />--In addition, the floor plan to be utilized for the treatment facility <br />will also be submitted to the Utilities Department for review within <br />ten days. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.