My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/11/1981
CBCC
>
Meetings
>
1980's
>
1981
>
2/11/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:52:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/11/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e CH OWNER <br />ARCHITFCAIIIT <br />ORDER CONTRACTOR <br />FIELD ❑ <br />�* AIA DOCUMENT G701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER:9 (nine) <br />(name, address) County Courthouse <br />TO (Contractor) <br />(_ Reinhold Construction, <br />P.O. Box 666 <br />Cocoa, FL 32922 <br />Inca ARCHITECT'S PROJECT NO: 9364 <br />CONTRACT FOR: Additions and Renovation <br />L _j CONTRACT DATE: 4_2-80 <br />You are directed to make the following changes in this Contract: <br />CP -29 Provide and install one (1) additional light fixture type I'M" <br />in elevator pit $187.66 <br />The proposed changes in the work may result in additional time required <br />beyond the contract completion date. Additional time will be added to <br />the contract that is directly related to this change order. The con- <br />tractor will be paid for the additional required days at the rate of <br />$300.00 (three hundred) per day for fixed overhead costs. The number <br />of days requested are reflected in CP -29. <br />(See attached Change Proposal) <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . <br />. . S <br />689-,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . <br />. . S <br />127,320.81 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . <br />. . $ <br />816, 320.81 <br />The Contract Sum will be (increased) (dewaas" (uncbaaged) by this Change Order . <br />. . S <br />187.66 <br />The new Contract Sum including this Change Order will be . . . . . . . . . <br />. . S <br />816,508.47 <br />, <br />The Contract Time will be (increa" (decr*"ed) (unchanged) by <br />( — <br />) Days. <br />The Date of Completion as of the date of this Change Order therefore is Oct. <br />30, 1981 <br />, <br />Connell Metcalf b Eddy Reinhold Construction,Inc. <br />Indian River <br />County <br />ARCHITECT <br />1�'x20 S. Dixie HWy- �N��C-�ox 666 <br />0'YW5 <br />14th Ave. <br />A& al Gables, FL 33134 ddress <br />Moat, FL 32922 <br />Address <br />Vero <br />Beach, FL <br />32960 <br />BY <br />W <br />DATE Z a DATE o2-11" R" <br />DATE <br />e r u a ry 11 , <br />1981 <br />AIA DOCUMENT 0791 ° CHANCE ORDER • APRIL 1970 EDITION • AIA® • 0 1970 ' THE <br />AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />ONE PACE <br />MR. KONTOULAS ANNOUNCED THAT HE WOULD WITHDRAW CHANGE <br />ORDER #14 RE THE COUNTY ADMINISTRATION BUILDING AT THIS TIME BECAUSE <br />OF A VERY CONSIDERABLE MATHEMATICAL ERROR, WHICH HE FELT WAS EXTENSIVE <br />ENOUGH TO REQUIRE THAT THE ARCHITECT SHOULD REWRITE THE CHANGE ORDER, <br />49 <br />_:_:FE B 1:1198 <br />
The URL can be used to link to this page
Your browser does not support the video tag.