My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-442 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-442 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:13:51 PM
Creation date
10/5/2015 8:56:53 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORM 722-05 STATE OF FLORIDA DEPARiTME"'."'OF TRANSPORTATION <br />7-77 DIVISION OF ROAD &ERATIONS <br />PAGE 1. OF 1 UTILITY/RAILROAD RELOCATION SCHEDULE <br />COUNTI. SECTION UTILITY JOB NO. STATE ROAD NO. COUNTY NAME PARCEL & R/W JOB NO. FAP NO. <br />88 000 6607 Hobart Rd. Indian River 1 (X&SD-D) SOS -0004(34) <br />AGENCY <br />FLORIDA EAST COAST RAILWAY COMPANY <br />A. <br />5V <br />V <br />E. <br />Facilities Involved (Detail as to Type and Location): Type IV' at -grade at Ry MP: 220.7 on <br />Hobart Rd. near Wabasso, Fla. <br />Crossing No.: 272170-U <br />Relocation Work Anticipated (Describe and Relate to Location on Project): Reconstruct existing <br />crossing to accommodate widening of Roadway in accordance with Department's <br />index GRR-01. <br />Anticipated Relocation Schedule (Based on normal schedule and 5 -day work week): <br />ITEM CALENDAR DAYS ESTIMATED <br />Preliminary Engineering <br />Material Procurement 20 <br />Right of Way Acquisition <br />Contract Negotiations (for utility/railroad work) 30 <br />Other <br />Construction (actual utility/railroad relocation time at job site) ( 5 }* <br />ESTIMATED MAXIMUM TOTAL 65 Days <br />ADJUSTED UTILITY/RAILROAD RELOCATION PERIOD <br />(Allow for concurrent activities) ESTIMATED NIINIMUnI TOTAL 45 Days <br />* SeP Highway Contract Special Provisions <br />Special Notation(s) to be included in Highway Contract Special Provisions: <br />This AGENCY proposes to commence actual relocation and/or adjustment work: (Check one) <br />❑ prior to highway contract advertisement, and relocation should be % complete by date of <br />preconstruction conference. <br />❑ concurrently with project advertisement. <br />❑ concurrently with commencement of highway construction. <br />The above data is based on construction plans and schedules prepared by the DEPARTMENT, and, therefore, is <br />furnished for informational purposes only. This AGENCY is not responsible for circumstances beyond its normal <br />control. However, the AGENCY will endeavor to fully cooperate with the DEPARTMENT, and its Contractor, in <br />clearing the project right of way as expeditiously as possible. The AGENCY'S Field Representatives can be contacted <br />at: Telephone Number: <br />SUBMITTED FOR THE AGENCY BY: R • W. Fondren, Chief Fng - - FFC Date: <br />12/28/78 <br />Mike J. Dross i /t1.'9�� ' ' <br />DEPARTMENTAL APPROVAL BY: ��', 4t: Date: <br />AXM-XUti1ii n-gineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.