My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-442 (2)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-442 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:13:51 PM
Creation date
10/5/2015 8:56:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
04/04/1979
Control Number
2008-442
Agenda Item Number
No data from migration
Entity Name
FEC Railway - Hobart Road reimbursement agreement
Subject
Received orig. document 5/20/08
Supplemental fields
SmeadsoftID
8309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORM 722-05 STATE OF FLORIDA DEPAR'T'MENT OF TRANSPORTATI <br />7-77 DIVISION OF RdAO OPWRATIONS <br />PACE I OF I UTILITY/RAILROAD RELOCATION SCHEDULE <br />COUNTY <br />SECTION <br />UTILITY JOB NO. <br />STATE ROAD NO. <br />COUNTY NAME <br />PARCEL & R/W JOB NO. <br />FAP NO. <br />88 <br />000 <br />6607 <br />Hobart Rd. <br />Indian River' <br />1 (X&SD-D) <br />FsoS-0004(34) <br />AGENCY <br />FLORIDA EAST COAST RAILWAY COMPANY <br />A. <br />43 <br />C0 <br />19 <br />E.. <br />Facilities Involved (Detail as to Type and Location): Type I, C1assI R.Y. warning devices <br />on Hobart Rd. at Ry. MP: 220.7 near Wabasso, Fla. <br />Crossing No.: 272170-U <br />Relocation Work Anticipated (Describe and Relate to Location on Project): Relocate existing <br />warning devices to accommdate widening of Roadway in accordance with Department's <br />index 17882w;i1, Mer.dd ;a;�a �GtPsT <br />Anticipated Relocation Schedule (Based on normal schedule and 5 -day work week): <br />ITEM CALENDAR DAYS ESTIMATED <br />Preliminary Engineering <br />Material Procurement 10 <br />Right of Way Acquisition <br />Contract Negotiations (for utility/railroad work) <br />Other <br />Construction (actual utility/railroad relocation time at job site) <br />ESTIMATED MAXIMUM TOTAL <br />ADJUSTED UTILITY/RAILROAD RELOCATION PERIOD <br />(Allow for concurrent activities) ESTIMATED MINIMUM TOTAL <br />* See Highway Contract Special Provisions <br />Special Notation(s) to be included in Highway Contract Special Provisions: <br />30 <br />5 L <br />48 <br />This AGENCY proposes to commence actual relocation and/or adjustment work: (Check one) <br />❑ prior to highway contract advertisement, and relocation should be % complete by date of <br />preconstruetion conference. <br />❑ concurrently with project advertisement. <br />U concurrently with commencement of highway construction. <br />Days <br />Days <br />The above data is based on construction plans and schedules prepared by the DEPARTMENT, and, therefore, is <br />furnished for informational purposes only. This AGENCY is not responsible for circumstances beyond its normal <br />control. However, the AGENCY will endeavor to fully cooperate with the DEPARTMENT, and its Contractor, in <br />clearing the project right of way as expeditiously as possible. The AGENCY'S Field Representatives can be contacted <br />at: Telephone Number: <br />SUBMITTED FOR THE AGENCY BY: 11. E. Webb - Supt. S&C-FEC Date: <br />DEPARTMENTAL APPROVAL BY: Mike J. Dross Date: <br />EPiAM Utilit , � ngineer <br />/a -/ 7- 71? <br />DEC 2 01978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.