My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
3/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:58:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
03/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />MAR 251981 <br />CHANGED <br />Gtiti'NER <br />p <br />ORDER <br />— ARCHITfCT <br />CONTRACTOR (� <br />AlA DOCUmfNi G701 <br />fIEID [] <br />OTHER <br />PROJECT: Indian River <br />County <br />(name, address) Courthouse <br />TO (Contractor) <br />CHANGE ORDER NUMBER: ..14 (fourteen) <br />F- Reinhold Construction Inc. ARCHITECT'S PROJECT NO: 9364 <br />P.O. Box 666 <br />Cocoa, F1. 32922 CONTRACT FOR: Adds. & Renovations <br />L J CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -35 Provide obscure glass panels in bottom panels of <br />windows in Rooms 241,232,203, and 206 $249,02 <br />The proposed changes In the work may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this change order. <br />The contractor will be paid for the additional requred days at the <br />rate of $300.00(threehundred) per day for fixed overhead costs. <br />OWNER REQUEST <br />The original Contract Sum was . . . . . . . . . , i 689, 000.00 <br />Net change by previous Change Orders . . . . . <br />The Contract Sum prior to this Change Order was .S 134,312.99 <br />The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order . , , $ 823,312.99 02 <br />The new Contract Sum including this Change Order will be 249.02 <br />The Contracr'Time will be (increased) (decreased) (unchanged) by . . ' $ �.8�3 "823,562.01 <br />The Date of Completion as of the date of this Change Order therefore is ( -- ) Days. <br />t.Dnnell Metcalf & Eddy Reinhold Construction Inc. <br />ARCHI I tLt 1320 S. Dixie Hiway CONTRACTOR P.O. Box 6Z- -- <br />/sddress Cur'l—Gabtes,-- f -t 3316 ress <br />BY V <br />BY <br />DATE <br />DATE <br />AIA DOCUMENT 6701 CHANGE ORDER • APRIL 1970 EDITION AIA;' • 0 1970 • THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />_ Indian River County <br />&"-7N—'ER T 45-T4t1FA Ee. <br />Address Vero Beac F x'60 <br />BY <br />DATE J — 2 -- <br />ONE PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.