My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
3/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:58:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
03/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•r <br />CHANGE ARC <br />ORDER CONTRACTOR <br />FIELD ❑ <br />AIA DOCUMENT G701 OTHER <br />PROJECT: Indian River County r, CHANGE ORDER NUMBER: 16 (sixteen) <br />(name, address) County Courthouse <br />TO (Contractor) <br />`Reinhold Construction Inc. ARCHITECT'S PROJECT NO:9364 <br />p.0.Box 666 CONTRACT FOR:Additions and Renovations <br />Cocoa, Florida 32922 <br />L.. CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: <br />C <br />R <br />CP -34 Rerw ve existing roof framing as required, provide new $1,726.85 <br />roof framing and new roof hatch enclosure walls as per <br />sketches, in room #207. Existing field conditions, <br />The proposed changes in the work may result in additions) time <br />required beyond the contract completion date. Additional time <br />will be added to thae contract that is diredtly related to this <br />change order. The contractor will be paid for the additional required <br />days at the rate of $300.00 (three hundred) per day for fixed <br />overhead costs. <br />0 <br />The original Contract Sum was . . . . . . . . . . . . . . . S 689,000.00 <br />Net change by previous Change Orden . . . . • • • • • • • • • • • • • . $ 140 , 418.42 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 829,418.42 <br />The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order . . . E 1,726.85 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 831 ,145.27 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( - - ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />Address <br />Coral Gabl F 33134 <br />BY <br />DATE / 11 <br />REINHPID CONSTRUCTION IN <br />CONTRACTOR.. <br />Address <br />Cocoa, FL 32922 <br />BY— <br />DATE /" / J'/ <br />INDIAN,RIVER COUNTY <br />OWNER <br />2145 14th Ave <br />Address <br />Vero Beach, FL 32960 <br />BY ) <br />DATE t� I <br />AIA DOCUMENT GM - CHANGE ORDER - APRIL 1970 EDITION • AIA® - ® 1970 • THE ONE PAGE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.