My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
3/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:58:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
03/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION RE TREASURE COAST UTILITIES <br />ATTORNEY COLLINS NOTED THAT THE PUBLIC HEARING RECENTLY <br />HELD ON TREASURE COAST UTILITIES WAS FOR THE PURPOSE OF PRESENTING <br />THE VARIOUS ITEMS OF DEFICIENCY REVOLVING AROUND THIS SYSTEM AND <br />TO GIVE THE PROPERTY OWNERS WITHIN THE SYSTEM AN OPPORTUNITY TO <br />EXPRESS THEIR CONCERNS AND ANY ADDITIONAL AREAS OF DEFAULT OF WHICH <br />WE MIGHT NOT BE KNOWLEDGEABLE. HE CONTINUED THAT UTILITY DIRECTOR <br />LINER HAS GONE THROUGH THE FRANCHISE AREA, PICKED OUT AREAS AND SET <br />FORTH DEFAULTS,' -AND THE ATTORNEY RECOMMENDED THAT THE BOARD NOW <br />AUTHORIZE THE UTILITY DEPARTMENT TO SEND A LETTER TO THE FRANCHISE <br />HOLDER OUTLINING THE DEFICIENCIES AND SETTING A PERIOD OF 30 DAYS <br />WITHIN WHICH THEY ARE TO BE CURED. <br />ON MOTION BY COMMISSIONER SCURLOCK, SECONDED BY=COMMISSIONER <br />FLETCHER, THE BOARD UNANIMOUSLY AUTHORIZED THE UTILITY DEPARTMENT TO <br />COMPILE THE DEFAULT AREAS IN THE TREASURE COAST UTILITIES FRANCHISE <br />AND SEND A LETTER TO THE FRANCHISE HOLDER, OUTLINING SUCH DEFICIENCIES <br />AND SETTING A PERIOD OF 30 DAYS WITHIN WHICH THOSE DEFICIENCIES ARE <br />TO BE CURED, AND REQUESTING THE COMPANY °S FINANCIAL DATA FOR THE LAST <br />THREE YEARS. <br />ATTORNEY COLLINS ASKED HOW THE BOARD WOULD FEEL ABOUT <br />AUTHORIZING THE INITIAL ENGINEERING ON WHAT IT WOULD TAKE TO RESOLVE <br />THIS MATTER IN THE EVENT MR. SALTER DOES NOT CURE THE DEFICIENCIES. <br />'DISCUSSION ENSUED ON THE POSSIBLE COST INVOLVED AND THE <br />EXTENT OF THE ENGINEERING DESIRED. COMMISSIONER WODTKE DID NOT FEEL <br />THAT THIS WOULD INVOLVE A GREAT EXPENDITURE OF FUNDS BUT WOULD BE <br />AIMED MAINLY AT HAVING THE ENGINEER IN A POSITION TO BE ABLE TO TELL <br />1 <br />US WHAT OUR OPTIONS ARE, I.E. HOW WE COULD BEEF THE SYSTEM UP TO MAKE <br />IT WORKABLE, ETC. HE DID NOT FEEL WE WOULD BE SPENDING MORE THAN <br />$1,500, <br />ADMINISTRATOR NELSON SUGGESTED,SINCE THE ENGINEER ALREADY <br />HAS DONE THE INITIAL INVENTORY, --THAT A NOT TO EXCEED $I,000 LIMIT <br />WOULD BE SUFFICIENT. <br />55 <br />BOOK 46 PAG 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.